Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0609 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,360 | $25,380 | n/a |
UF0609 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $104,116 | $322,608 | n/a |
UF0609 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $38,174 | $25,504 | n/a |
UF0609 # 07 Y:2024 | 07 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $21,071 | $25,000 | n/a |
UF0609 # 04 Y:2024 | 04 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $14,767 | $40,488 | n/a |
UF0609 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $3,546 | $9,000 | n/a |
UF0609 # 06 Y:2024 | 06 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $35,940 | $0 | n/a |
UF0520 # 03 Y:2018 | 03 | 2018 | ISOLATE HOT OR COLD EQUIPMENT | $5,366 | $5,125 | Not Implemented |
UF0520 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $1,303 | $2,207 | Implemented |
UF0520 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,084 | $1,020 | Implemented |
UF0520 # 06 Y:2018 | 06 | 2018 | USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE | $75,538 | $33,400 | Implemented |
UF0520 # 02 Y:2018 | 02 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $4,699 | $15,000 | Implemented |
UF0520 # 01 Y:2018 | 01 | 2018 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $219,545 | $970,000 | Not Implemented |
UF0505 # 04 Y:2017 | 04 | 2017 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $13,763 | $120 | Implemented |
UF0505 # 05 Y:2017 | 05 | 2017 | INSTALL TURBULATORS | $12,705 | $7,500 | Not Implemented |
UF0505 # 01 Y:2017 | 01 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $715,231 | $1,700,000 | Not Implemented |
UF0505 # 03 Y:2017 | 03 | 2017 | INCREASE AMOUNT OF CONDENSATE RETURNED | $18,902 | $2,800 | Implemented |
UF0505 # 02 Y:2017 | 02 | 2017 | REPLACE BOILER | $152,736 | $200,000 | Implemented |
UF0505 # 08 Y:2017 | 08 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $4,554 | $1,592 | Implemented |
UF0505 # 07 Y:2017 | 07 | 2017 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $7,374 | $4,000 | Not Implemented |
UF0505 # 06 Y:2017 | 06 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $7,831 | $1,081 | Implemented |
MI0223 # 11 Y:2012 | 11 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $401 | $1,103 | Implemented |
MI0223 # 08 Y:2012 | 08 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,364 | $5,920 | Not Implemented |
MI0223 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,824 | $4,510 | Implemented |
MI0223 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,047 | $1,660 | Implemented |