IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0160 # 10 Y:2014 10 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $11,172 $24,000 Not Implemented
MZ0160 # 09 Y:2014 09 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,495 $0 Not Implemented
MZ0160 # 08 Y:2014 08 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,300 $5,000 Implemented
MZ0160 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,778 $7,000 Not Implemented
MZ0160 # 06 Y:2014 06 2014 ELIMINATE/REDUCE AN OPERATION $7,727 $0 Not Implemented
MZ0160 # 05 Y:2014 05 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $13,436 $24,000 Not Implemented
MZ0160 # 04 Y:2014 04 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $47,644 $117,000 Not Implemented
MZ0160 # 03 Y:2014 03 2014 REPLACE BOILER $32,000 $65,000 Not Implemented
MZ0160 # 02 Y:2014 02 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,000 $15,000 Not Implemented
MZ0160 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,719 $74,400 Implemented
IC0160 # 12 Y:2009 12 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $415 $0 Not Implemented
IC0160 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,507 $33,261 Implemented
IC0160 # 11 Y:2009 11 2009 UPGRADE CONTROLS ON COMPRESSORS $4,813 $0 Not Implemented
IC0160 # 10 Y:2009 10 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $179 $0 Implemented
IC0160 # 09 Y:2009 09 2009 USE MINIMUM STEAM OPERATING PRESSURE $340 $0 Not Implemented
IC0160 # 08 Y:2009 08 2009 REPAIR AND ELIMINATE STEAM LEAKS $746 $58 Implemented
IC0160 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,043 $345 Implemented
IC0160 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,221 $42,838 Implemented
IC0160 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,819 $131,206 Implemented
IC0160 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,109 $51,610 Not Implemented
IC0160 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $292 $653 Implemented
IC0160 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,924 $17,420 Implemented