Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0268 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,442 | $6,000 | Not Implemented |
TT0268 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,691 | $2,695 | Not Implemented |
TT0268 # 05 Y:2022 | 05 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,223 | $500 | Implemented |
TT0268 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,268 | $3,480 | Not Implemented |
TT0268 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $14,583 | $49,071 | Not Implemented |
TT0268 # 02 Y:2022 | 02 | 2022 | REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS | $17,027 | $10,000 | Not Implemented |
TT0268 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,947 | $60,000 | Not Implemented |
TT0258 # 06 Y:2021 | 06 | 2021 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,703 | $7,500 | Not Implemented |
TT0258 # 08 Y:2021 | 08 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $445 | $0 | Not Implemented |
TT0258 # 07 Y:2021 | 07 | 2021 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $1,108 | $5,000 | Not Implemented |
TT0258 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,092 | $10,000 | Not Implemented |
TT0258 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,652 | $4,000 | Not Implemented |
TT0258 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,751 | $37,500 | Not Implemented |
TT0258 # 02 Y:2021 | 02 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,627 | $25,000 | Not Implemented |
TT0258 # 01 Y:2021 | 01 | 2021 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $65,709 | $230,400 | Not Implemented |
TN0210 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,637 | $100 | Implemented |
TN0210 # 05 Y:1984 | 05 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $246 | $20 | Implemented |
TN0210 # 04 Y:1984 | 04 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $189 | $70 | Implemented |
TN0210 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $879 | $2,780 | Not Implemented |
TN0210 # 02 Y:1984 | 02 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,764 | $2,000 | Implemented |