IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0778 # 05 Y:2017 05 2017 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $8,708 $9,000 Not Implemented
MA0778 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,137 $11,649 Implemented
MA0778 # 03 Y:2017 03 2017 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $17,175 $73,000 Implemented
MA0778 # 02 Y:2017 02 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $17,208 $14,500 Implemented
MA0778 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $93,550 $132,200 Not Implemented
MA0777 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,627 $11,435 Not Implemented
MA0777 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,805 $3,330 Not Implemented
MA0777 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $2,136 $5,392 Not Implemented
MA0777 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,610 $30,976 Not Implemented
MA0777 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,579 $137,422 Not Implemented
TT0193 # 09 Y:2017 09 2017 INSTALL TIMERS AND/OR THERMOSTATS $464 $2,000 Implemented
TT0193 # 01 Y:2017 01 2017 INSULATE BARE EQUIPMENT $35,857 $10,000 Implemented
TT0193 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,374 $32,000 Implemented
TT0193 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,088 $22,470 Not Implemented
TT0193 # 04 Y:2017 04 2017 UPGRADE CONTROLS ON COMPRESSORS $5,162 $360 Not Implemented
TT0193 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,550 $3,000 Implemented
TT0193 # 06 Y:2017 06 2017 INSTALL COMMON HEADER ON COMPRESSORS $3,186 $8,600 Not Implemented
TT0193 # 07 Y:2017 07 2017 DEVELOP A REPAIR/REPLACE POLICY $1,978 $4,283 Not Implemented
TT0193 # 08 Y:2017 08 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $949 $125 Implemented
GT0897 # 04 Y:2017 04 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,316 $19,418 Implemented
GT0897 # 05 Y:2017 05 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,351 $15,070 Implemented
GT0897 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,875 $15,743 Implemented
GT0897 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,189 $1,673 Not Implemented
GT0897 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $499 $607 Implemented
GT0897 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $2,357 $1,400 Not Implemented