Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
60
matching recommendationsSIC | 2822 | Synthetic Rubber |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0420 # 09 Y:2002 | 09 | 2002 | USE PHOTOCELL CONTROLS | $1,500 | $2,300 | Implemented |
AM0420 # 10 Y:2002 | 10 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $700 | $0 | Implemented |
LL0134 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $167 | $30 | Implemented |
LL0134 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $450 | $90 | Implemented |
LL0134 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,068 | $210 | Implemented |
LL0129 # 01 Y:2002 | 01 | 2002 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $191,600 | $22,000 | Implemented |
LL0129 # 08 Y:2002 | 08 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $36,741 | $7,200 | Implemented |
LL0129 # 07 Y:2002 | 07 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $52,853 | $12,720 | Implemented |
LL0129 # 06 Y:2002 | 06 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,381 | $28,907 | Implemented |
LL0129 # 05 Y:2002 | 05 | 2002 | OPTIMIZE PLANT POWER FACTOR | $121,713 | $95,025 | Implemented |
OD0157 # 03 Y:2000 | 03 | 2000 | REPAIR OR REPLACE STEAM TRAPS | $4,241 | $1,420 | Implemented |
OD0158 # 05 Y:2000 | 05 | 2000 | REPAIR OR REPLACE STEAM TRAPS | $20,642 | $4,920 | Implemented |
NV0063 # 08 Y:1996 | 08 | 1996 | USE OPTIMUM THICKNESS INSULATION | $9,970 | $2,000 | Implemented |
NV0063 # 01 Y:1996 | 01 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,596 | $200 | Implemented |
NV0063 # 03 Y:1996 | 03 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,184 | $90 | Implemented |
NV0063 # 04 Y:1996 | 04 | 1996 | INSTALL OCCUPANCY SENSORS | $100 | $57 | Implemented |
NV0063 # 06 Y:1996 | 06 | 1996 | INSULATE BARE EQUIPMENT | $2,375 | $1,452 | Implemented |
NV0063 # 11 Y:1996 | 11 | 1996 | MODIFY MATERIAL APPLICATION METHODS | $28,063 | $2,040 | Implemented |
NV0063 # 09 Y:1996 | 09 | 1996 | USE OPTIMUM THICKNESS INSULATION | $4,848 | $6,210 | Implemented |
NV0063 # 07 Y:1996 | 07 | 1996 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,535 | $5,200 | Implemented |
OK0479 # 05 Y:1995 | 05 | 1995 | INSTALL OCCUPANCY SENSORS | $1,266 | $528 | Implemented |
OK0479 # 06 Y:1995 | 06 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $19,078 | $11,000 | Implemented |
OK0479 # 07 Y:1995 | 07 | 1995 | REDUCE SCRAP PRODUCTION | $25,650 | $0 | Implemented |
OK0479 # 04 Y:1995 | 04 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,868 | $3,950 | Implemented |
OK0479 # 03 Y:1995 | 03 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,121 | $2,948 | Implemented |