IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 2822 Synthetic Rubber
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2417 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $63,875 $514,800 n/a
LS2417 # 06 Y:2024 06 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,694 $120,300 n/a
LS2417 # 05 Y:2024 05 2024 UPGRADE CONTROLS ON COMPRESSORS $9,379 $28,000 n/a
LS2417 # 04 Y:2024 04 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $182,554 $481,830 n/a
LS2417 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $82,069 $99,800 n/a
LS2417 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,173 $90 n/a
LS2417 # 01 Y:2024 01 2024 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,135 $75 n/a
LS1801 # 03 Y:2018 03 2018 OPTIMIZE PLANT POWER FACTOR $54,034 $0 Not Implemented
LS1801 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,691 $0 Not Implemented
LS1801 # 01 Y:2018 01 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $69,575 $0 Implemented
AM0701 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $195,000 $2,000 Implemented
AM0701 # 01 Y:2016 01 2016 REPAIR OR REPLACE STEAM TRAPS $515,000 $75,000 Implemented
AM0701 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,125 $105,700 Implemented
AM0701 # 04 Y:2016 04 2016 PAY UTILITY BILLS ON TIME $57,500 $0 Implemented
AM0701 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $36,800 $61,950 Not Implemented
AM0701 # 06 Y:2016 06 2016 USE SYNTHETIC LUBRICANT $35,540 $0 Implemented
AM0701 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,900 $22,740 Not Implemented
AM0701 # 08 Y:2016 08 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,420 $210 Implemented
AM0701 # 09 Y:2016 09 2016 INSULATE BARE EQUIPMENT $1,325 $1,200 Implemented
LL0134 # 06 Y:2002 06 2002 AUTOMATE FINISHING PROCESS $142,800 $377,995 Not Implemented
LL0134 # 07 Y:2002 07 2002 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $6,399 $0 Not Implemented
LL0134 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $167 $30 Implemented
LL0134 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $90 Implemented
LL0134 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $1,100 $364 Not Implemented
LL0134 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,068 $210 Implemented