Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsSIC | 2823 | Cellulosic Manmade Fibers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0938 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,092 | $3,500 | Implemented |
GT0938 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $1,868 | $1,016 | Not Implemented |
GT0938 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,814 | $18,557 | Implemented |
GT0938 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $190 | $512 | Not Implemented |
GT0938 # 06 Y:2019 | 06 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $213 | $590 | Not Implemented |
GT0938 # 01 Y:2019 | 01 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $14,349 | $2,000 | Implemented |
LE0459 # 04 Y:2018 | 04 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $180 | $900 | Not Implemented |
LE0459 # 05 Y:2018 | 05 | 2018 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,564 | $8,400 | Implemented |
LE0459 # 03 Y:2018 | 03 | 2018 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,162 | $10,000 | Not Implemented |
LE0459 # 02 Y:2018 | 02 | 2018 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,140 | $9,000 | Implemented |
LE0459 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,864 | $13,360 | Implemented |
NC0559 # 14 Y:2016 | 14 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,366 | $1,800 | Not Implemented |
NC0559 # 15 Y:2016 | 15 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $2,264 | $4,256 | Implemented |
NC0559 # 13 Y:2016 | 13 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,085 | $1,000 | Implemented |
NC0559 # 12 Y:2016 | 12 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,545 | $8,000 | Not Implemented |
NC0559 # 11 Y:2016 | 11 | 2016 | INSTALL OCCUPANCY SENSORS | $494 | $347 | Implemented |
NC0559 # 10 Y:2016 | 10 | 2016 | USE PHOTOCELL CONTROLS | $1,339 | $1,600 | Implemented |
NC0559 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,038 | $320 | Implemented |
NC0559 # 07 Y:2016 | 07 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $34,146 | $10,000 | Implemented |
NC0559 # 06 Y:2016 | 06 | 2016 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,950 | $25,000 | Implemented |
NC0559 # 05 Y:2016 | 05 | 2016 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $20,410 | $15,050 | Not Implemented |
NC0559 # 04 Y:2016 | 04 | 2016 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,720 | $10,000 | Not Implemented |
NC0559 # 03 Y:2016 | 03 | 2016 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $4,003 | $1,000 | Implemented |
NC0559 # 02 Y:2016 | 02 | 2016 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $28,202 | $75,000 | Not Implemented |
NC0559 # 01 Y:2016 | 01 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $109,787 | $1,000 | Implemented |