Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 283 | Drugs |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0408 # 01 Y:1993 | 01 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,776 | $5,655 | Implemented |
KU0408 # 08 Y:1993 | 08 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $776 | $0 | Implemented |
KU0408 # 07 Y:1993 | 07 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $176 | $392 | Implemented |
KU0408 # 06 Y:1993 | 06 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,936 | $3,455 | Not Implemented |
KU0408 # 05 Y:1993 | 05 | 1993 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $497 | $580 | Not Implemented |
KU0408 # 04 Y:1993 | 04 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,399 | $300 | Implemented |
KU0408 # 03 Y:1993 | 03 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $176 | $0 | Implemented |
KU0408 # 02 Y:1993 | 02 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $547 | $1,440 | Not Implemented |
KU0266 # 08 Y:1988 | 08 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $406 | $580 | Not Implemented |
KU0266 # 07 Y:1988 | 07 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $898 | $1,500 | Implemented |
KU0266 # 06 Y:1988 | 06 | 1988 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $1,336 | $1,300 | Not Implemented |
KU0266 # 05 Y:1988 | 05 | 1988 | RECOVER AND REUSE COOLING WATER | $791 | $860 | Implemented |
KU0266 # 04 Y:1988 | 04 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,624 | $100 | Implemented |
KU0266 # 03 Y:1988 | 03 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,166 | $7,300 | Not Implemented |
KU0266 # 02 Y:1988 | 02 | 1988 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $8,274 | $1,008 | Implemented |
KU0266 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $487 | $282 | Implemented |
KU0266 # 09 Y:1988 | 09 | 1988 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $396 | $580 | Implemented |