IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,591

matching recommendations
Reset
SIC 283 Drugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0395 # 04 Y:2021 04 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,816 $15,328 Not Implemented
MI0395 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,523 $1,980 Implemented
MI0395 # 02 Y:2021 02 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,790 $1,380 Implemented
MI0395 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,603 $2,100 Not Implemented
NL0061 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,556 $2,500 Implemented
NL0061 # 01 Y:2022 01 2022 METER WASTE WATER $9,914 $580 Not Implemented
NL0061 # 02 Y:2022 02 2022 USE POWER DURING OFF-PEAK PERIODS $9,080 $70 Implemented
NL0061 # 03 Y:2022 03 2022 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,939 $70 Implemented
NL0061 # 04 Y:2022 04 2022 METER WASTE WATER $3,714 $580 Not Implemented
NL0061 # 05 Y:2022 05 2022 RECOVER AND REUSE WASTE MATERIAL $3,432 $3,500 Implemented
NL0061 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $595 $1,289 Implemented
NL0061 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $967 $1,650 Not Implemented
NC0654 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $44,735 $130,000 Not Implemented
NC0654 # 04 Y:2020 04 2020 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,543 $6,700 Not Implemented
NC0654 # 03 Y:2020 03 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,303 $20,000 Not Implemented
NC0654 # 02 Y:2020 02 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,030 $75,000 Not Implemented
NC0654 # 01 Y:2020 01 2020 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $1,381,024 $8,000,000 Not Implemented
UD1024 # 11 Y:2020 11 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $636 $0 Implemented
UD1024 # 10 Y:2020 10 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,326 $30,000 Not Implemented
UD1024 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $40,609 $80,500 Not Implemented
UD1024 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,759 $10,650 Implemented
UD1024 # 07 Y:2020 07 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,282 $28,000 Not Implemented
UD1024 # 06 Y:2020 06 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $52,582 $24,500 Not Implemented
UD1024 # 05 Y:2020 05 2020 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $921,416 $672,400 Not Implemented
UD1024 # 04 Y:2020 04 2020 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $15,421 $0 Not Implemented