IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,591

matching recommendations
Reset
SIC 283 Drugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0175 # 04 Y:1985 04 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $576 $0 Implemented
KU0175 # 05 Y:1985 05 1985 INSTALL AUTOMATIC STACK DAMPER $414 $1,300 Not Implemented
KU0175 # 06 Y:1985 06 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $337 $0 Implemented
KU0175 # 07 Y:1985 07 1985 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $313 $1,500 Not Implemented
KU0175 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $191 $0 Implemented
KU0175 # 09 Y:1985 09 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $175 $0 Implemented
ST0031 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,995 $1,070 Implemented
ST0031 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $201 $75 Implemented
ST0031 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,132 $116 Implemented
ST0031 # 04 Y:1985 04 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,348 $1,900 Not Implemented
ST0031 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $610 $1,500 Not Implemented
ST0031 # 06 Y:1985 06 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,311 $537 Not Implemented
ST0031 # 07 Y:1985 07 1985 INSULATE BARE EQUIPMENT $428 $110 Implemented
ST0031 # 08 Y:1985 08 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,500 $2,400 Not Implemented
ST0031 # 09 Y:1985 09 1985 AIR CONDITION ONLY SPACE NECESSARY $537 $300 Not Implemented
ST0031 # 10 Y:1985 10 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,813 $1,255 Implemented
ST0031 # 11 Y:1985 11 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $20,807 $12,000 Not Implemented
KU0117 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,895 $15,000 Not Implemented
KU0117 # 02 Y:1984 02 1984 INSTALL TURBULATORS $4,977 $2,620 Not Implemented
KU0117 # 03 Y:1984 03 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,455 $300 Not Implemented
KU0117 # 04 Y:1984 04 1984 REPAIR OR REPLACE STEAM TRAPS $18,415 $4,200 Implemented
KU0117 # 05 Y:1984 05 1984 OPTIMIZE PLANT POWER FACTOR $6,702 $9,600 Not Implemented
KU0117 # 06 Y:1984 06 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,430 $2,900 Not Implemented
KU0117 # 07 Y:1984 07 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $336 $500 Not Implemented
KU0117 # 08 Y:1984 08 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,541 $4,029 Implemented