IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

202

matching recommendations
Reset
SIC 2833 Medicinals And Botanicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0469 # 03 Y:2019 03 2019 INSTALL SKYLIGHTS $4,029 $14,835 Not Implemented
AS0469 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,578 $900 Not Implemented
AS0469 # 05 Y:2019 05 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,906 $420 Not Implemented
OR0691 # 01 Y:2017 01 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $220,769 $39,442 Not Implemented
OR0691 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,762 $1,200 Implemented
OR0691 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $772 $4,048 Not Implemented
OR0691 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $955 $1,955 Implemented
UU0119 # 08 Y:2017 08 2017 COMBINE UTILITY METERS $657 $1,125 Not Implemented
UU0119 # 03 Y:2017 03 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,428 $0 Not Implemented
UU0119 # 04 Y:2017 04 2017 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,918 $0 Not Implemented
UU0119 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,742 $3,975 Not Implemented
UU0119 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $4,431 $4,250 Not Implemented
UU0119 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,903 $2,472 Implemented
UU0119 # 06 Y:2017 06 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,324 $3,000 Not Implemented
UU0119 # 07 Y:2017 07 2017 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,100 $0 Not Implemented
UU0119 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $127 $240 Implemented
UM0474 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,312 $4,000 n/a
UM0474 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,508 $500 n/a
UM0474 # 03 Y:2017 03 2017 USE PHOTOCELL CONTROLS $457 $200 n/a
NC0574 # 02 Y:2016 02 2016 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $15,850 $30,000 Not Implemented
NC0574 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $63 $50 Implemented
NC0574 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $5,360 Implemented
NC0574 # 06 Y:2016 06 2016 USE PHOTOCELL CONTROLS $1,303 $150 Implemented
NC0574 # 05 Y:2016 05 2016 REPAIR OR REPLACE STEAM TRAPS $11,171 $2,250 Not Implemented
NC0574 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,055 $1,605 Not Implemented