IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

187

matching recommendations
Reset
SIC 2833 Medicinals And Botanicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0119 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,742 $3,975 Not Implemented
UM0474 # 03 Y:2017 03 2017 USE PHOTOCELL CONTROLS $457 $200 n/a
UM0474 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,312 $4,000 n/a
UM0474 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,508 $500 n/a
NC0574 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,055 $1,605 Not Implemented
NC0574 # 02 Y:2016 02 2016 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $15,850 $30,000 Not Implemented
NC0574 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $138,968 $500 Implemented
NC0574 # 05 Y:2016 05 2016 REPAIR OR REPLACE STEAM TRAPS $11,171 $2,250 Not Implemented
NC0574 # 06 Y:2016 06 2016 USE PHOTOCELL CONTROLS $1,303 $150 Implemented
NC0574 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $5,360 Implemented
NC0574 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $63 $50 Implemented
NC0574 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $33,367 $49,000 Not Implemented
NC0391 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,946 $59,958 Not Implemented
NC0391 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $257 $100 Implemented
NC0391 # 04 Y:2009 04 2009 DEVELOP A REPAIR/REPLACE POLICY $4,320 $6,886 Not Implemented
NC0391 # 03 Y:2009 03 2009 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $5,889 $6,500 Not Implemented
NC0391 # 02 Y:2009 02 2009 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $18,020 $25,000 Implemented
NC0391 # 01 Y:2009 01 2009 INCREASE AMOUNT OF CONDENSATE RETURNED $5,716 $10,000 Implemented
DL0031 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $693 $0 Implemented
DL0031 # 09 Y:2008 09 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,944 $7,500 Implemented
DL0031 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,757 $0 Not Implemented
DL0031 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,430 $0 Not Implemented
DL0031 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,809 $229 Implemented
DL0031 # 06 Y:2008 06 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,857 $5,600 Not Implemented
DL0031 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $3,200 $0 Not Implemented