IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

446

matching recommendations
Reset
SIC 2834 Pharmaceutical Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0335 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,147 $30,570 Implemented
MS0335 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,037 $389 Implemented
MS0335 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,045 $8,725 Implemented
OR0541 # 01 Y:2008 01 2008 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $277,000 $77,500 Implemented
IC0141 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,733 $24,016 Implemented
IC0141 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,800 $49,250 Implemented
IC0141 # 06 Y:2008 06 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,794 $14,000 Implemented
IC0141 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,000 $11,500 Implemented
IC0141 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,750 $1,400 Implemented
MI0162 # 02 Y:2008 02 2008 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE $98,398 $18,460 Implemented
MI0162 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $73,832 $1,750 Implemented
MI0162 # 06 Y:2008 06 2008 REPAIR OR REPLACE STEAM TRAPS $11,109 $400 Implemented
MI0162 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,769 $1,210 Implemented
MI0162 # 09 Y:2008 09 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,630 $40 Implemented
LE0259 # 02 Y:2007 02 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,235 $500 Implemented
LE0259 # 03 Y:2007 03 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,283 $45,000 Implemented
LE0259 # 04 Y:2007 04 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,735 $37,000 Implemented
LE0259 # 05 Y:2007 05 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,811 $200 Implemented
MS0318 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,453 $34,528 Implemented
MS0318 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,884 $20,897 Implemented
MS0318 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,013 $401 Implemented
MS0318 # 04 Y:2007 04 2007 REPAIR AND ELIMINATE STEAM LEAKS $2,805 $156 Implemented
MS0318 # 06 Y:2007 06 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $587 $0 Implemented
LL0271 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,710 $3,760 Implemented
LL0271 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,159 $5,905 Implemented