Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 2834 | Pharmaceutical Preparations |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0158 # 08 Y:2016 | 08 | 2016 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $20,534 | $96,100 | Implemented |
DL0158 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $96,070 | $380,000 | Implemented |
DL0158 # 05 Y:2016 | 05 | 2016 | REDUCE HEAT GAIN BY WINDOW TINTING | $54,090 | $104,500 | Implemented |
DL0158 # 02 Y:2016 | 02 | 2016 | REDUCE VENTILATION AIR | $310,823 | $38,750 | Implemented |
DL0102 # 02 Y:2013 | 02 | 2013 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $25,460 | $100 | Implemented |
DL0102 # 01 Y:2013 | 01 | 2013 | REDUCE VENTILATION AIR | $31,820 | $3,200 | Implemented |
DL0053 # 09 Y:2010 | 09 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $40,900 | $10,240 | Implemented |
DL0053 # 15 Y:2010 | 15 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,000 | $31,440 | Implemented |
DL0053 # 14 Y:2010 | 14 | 2010 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $18,000 | $8,600 | Implemented |
DL0053 # 13 Y:2010 | 13 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,600 | $100 | Implemented |
DL0053 # 11 Y:2010 | 11 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,000 | $10 | Implemented |
DL0053 # 08 Y:2010 | 08 | 2010 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $61,000 | $20 | Implemented |
DL0053 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $74,000 | $700 | Implemented |
DL0053 # 05 Y:2010 | 05 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $80,000 | $30,000 | Implemented |
DL0053 # 04 Y:2010 | 04 | 2010 | INCREASE AMOUNT OF CONDENSATE RETURNED | $58,000 | $60,000 | Implemented |
DL0053 # 03 Y:2010 | 03 | 2010 | ADD AREA LIGHTING SWITCHES | $123,000 | $29,200 | Implemented |
DL0053 # 01 Y:2010 | 01 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $358,000 | $4,000 | Implemented |
DL0028 # 02 Y:2008 | 02 | 2008 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $47,800 | $15,000 | Implemented |
DL0028 # 09 Y:2008 | 09 | 2008 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $1,400 | $400 | Implemented |
DL0028 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,290 | $12,000 | Implemented |
DL0028 # 05 Y:2008 | 05 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,900 | $2,520 | Implemented |
DL0028 # 04 Y:2008 | 04 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,700 | $3,000 | Implemented |