Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,141
matching recommendationsSIC | 2834 | Pharmaceutical Preparations |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0148 # 04 Y:2015 | 04 | 2015 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $19,529 | $1,740 | Implemented |
UA0148 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,888 | $870 | Not Implemented |
UA0148 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,998 | $100 | Not Implemented |
UA0148 # 07 Y:2015 | 07 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,387 | $1,800 | Not Implemented |
UM0458 # 01 Y:2015 | 01 | 2015 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $7,036 | $0 | Implemented |
SD0500 # 01 Y:2015 | 01 | 2015 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $326,647 | $943,500 | Implemented |
SD0500 # 02 Y:2015 | 02 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $105,336 | $417,200 | Implemented |
SD0500 # 03 Y:2015 | 03 | 2015 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $9,500 | $500 | Not Implemented |
SD0500 # 04 Y:2015 | 04 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,982 | $3,060 | Not Implemented |
SD0500 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,931 | $400 | Not Implemented |
SD0500 # 06 Y:2015 | 06 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,651 | $500 | Implemented |
SD0500 # 07 Y:2015 | 07 | 2015 | USE PHOTOCELL CONTROLS | $1,308 | $2,775 | Implemented |
UM0455 # 01 Y:2015 | 01 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,635 | $2,000 | Not Implemented |
UM0455 # 02 Y:2015 | 02 | 2015 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $8,778 | $0 | Not Implemented |
UM0455 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,898 | $500 | Implemented |
UM0455 # 04 Y:2015 | 04 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,274 | $7,300 | Implemented |
UM0455 # 05 Y:2015 | 05 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,338 | $2,500 | Implemented |
UM0455 # 06 Y:2015 | 06 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,725 | $25,000 | Not Implemented |
UD0910 # 01 Y:2014 | 01 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $235 | $0 | Implemented |
UD0910 # 02 Y:2014 | 02 | 2014 | RECOVER AND REUSE COOLING WATER | $5,500 | $2,000 | Not Implemented |
UD0910 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,400 | $10,000 | Implemented |
UD0910 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,016 | $1,000 | Not Implemented |
UD0910 # 05 Y:2014 | 05 | 2014 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $332,549 | $400,000 | Not Implemented |
UD0910 # 06 Y:2014 | 06 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $19,208 | $40,430 | Not Implemented |
UD0910 # 07 Y:2014 | 07 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $11,334 | $18,902 | Implemented |