IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,141

matching recommendations
Reset
SIC 2834 Pharmaceutical Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0148 # 04 Y:2015 04 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $19,529 $1,740 Implemented
UA0148 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,888 $870 Not Implemented
UA0148 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,998 $100 Not Implemented
UA0148 # 07 Y:2015 07 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,387 $1,800 Not Implemented
UM0458 # 01 Y:2015 01 2015 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $7,036 $0 Implemented
SD0500 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $326,647 $943,500 Implemented
SD0500 # 02 Y:2015 02 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $105,336 $417,200 Implemented
SD0500 # 03 Y:2015 03 2015 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,500 $500 Not Implemented
SD0500 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,982 $3,060 Not Implemented
SD0500 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,931 $400 Not Implemented
SD0500 # 06 Y:2015 06 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,651 $500 Implemented
SD0500 # 07 Y:2015 07 2015 USE PHOTOCELL CONTROLS $1,308 $2,775 Implemented
UM0455 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,635 $2,000 Not Implemented
UM0455 # 02 Y:2015 02 2015 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $8,778 $0 Not Implemented
UM0455 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,898 $500 Implemented
UM0455 # 04 Y:2015 04 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,274 $7,300 Implemented
UM0455 # 05 Y:2015 05 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,338 $2,500 Implemented
UM0455 # 06 Y:2015 06 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,725 $25,000 Not Implemented
UD0910 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $235 $0 Implemented
UD0910 # 02 Y:2014 02 2014 RECOVER AND REUSE COOLING WATER $5,500 $2,000 Not Implemented
UD0910 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $10,400 $10,000 Implemented
UD0910 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,016 $1,000 Not Implemented
UD0910 # 05 Y:2014 05 2014 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $332,549 $400,000 Not Implemented
UD0910 # 06 Y:2014 06 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,208 $40,430 Not Implemented
UD0910 # 07 Y:2014 07 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $11,334 $18,902 Implemented