Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
178
matching recommendationsSIC | 2834 | Pharmaceutical Preparations |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0253 # 02 Y:2013 | 02 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $53,448 | $80 | Implemented |
MI0253 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,576 | $80 | Implemented |
MI0253 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,885 | $4,840 | Not Implemented |
MI0253 # 06 Y:2013 | 06 | 2013 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,676 | $1,660 | Implemented |
MI0253 # 05 Y:2013 | 05 | 2013 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $22,448 | $1,680 | Implemented |
MI0253 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $36,919 | $2,300 | Not Implemented |
MI0253 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,154 | $52,122 | Implemented |
MI0252 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $2,506 | $2,600 | Implemented |
MI0252 # 05 Y:2013 | 05 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,603 | $4,840 | Not Implemented |
MI0252 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,776 | $7,350 | Implemented |
MI0252 # 03 Y:2013 | 03 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,770 | $5,739 | Not Implemented |
MI0252 # 02 Y:2013 | 02 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,567 | $80 | Implemented |
MI0252 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,914 | $44,016 | Not Implemented |
MI0252 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,008 | $13,170 | Not Implemented |
MI0252 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,796 | $80 | Implemented |
MI0252 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,764 | $1,660 | Implemented |
MI0251 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,781 | $21,720 | Not Implemented |
MI0251 # 10 Y:2013 | 10 | 2013 | INSULATE BARE EQUIPMENT | $5,765 | $3,960 | Not Implemented |
MI0251 # 09 Y:2013 | 09 | 2013 | INSULATE BARE EQUIPMENT | $6,625 | $4,623 | Not Implemented |
MI0251 # 08 Y:2013 | 08 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,576 | $22,610 | Implemented |
MI0251 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,902 | $799 | Implemented |
MI0251 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,391 | $14,480 | Implemented |
MI0251 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,954 | $80 | Implemented |
MI0251 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,367 | $1,660 | Implemented |
MI0251 # 02 Y:2013 | 02 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $34,598 | $56,000 | Not Implemented |