IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,141

matching recommendations
Reset
SIC 2834 Pharmaceutical Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0359 # 06 Y:2019 06 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $59,287 $960 Implemented
MI0359 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,837 $1,980 Implemented
MI0359 # 08 Y:2019 08 2019 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $52,238 $52,238 Not Implemented
MI0359 # 09 Y:2019 09 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $47,169 $115,295 Not Implemented
MI0359 # 10 Y:2019 10 2019 USE SOLAR HEAT TO HEAT WATER $33,548 $29,934 Not Implemented
MI0359 # 11 Y:2019 11 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $32,799 $160 Not Implemented
MI0359 # 12 Y:2019 12 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $26,313 $7,820 Not Implemented
MI0359 # 13 Y:2019 13 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $23,546 $480 Implemented
CL1909 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,417 $15,294 Not Implemented
CL1909 # 02 Y:2019 02 2019 REPAIR AND ELIMINATE STEAM LEAKS $3,542 $2,040 Implemented
CL1909 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $647 $2,080 Implemented
CL1909 # 04 Y:2019 04 2019 PAY BILLS ON TIME TO AVOID LATE FEES $2,971 $0 Implemented
CL1909 # 05 Y:2019 05 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $143,304 $600 Not Implemented
MA0800 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,227 $20,050 Not Implemented
MA0800 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,117 $14,400 Not Implemented
MA0800 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,064 $15,819 Not Implemented
MA0800 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $893 $500 Implemented
MA0800 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $768 $500 Implemented
MI0348 # 01 Y:2019 01 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $27,411 $167,280 Implemented
MI0348 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,401 $2,020 Implemented
MI0348 # 03 Y:2019 03 2019 UPGRADE OBSOLETE EQUIPMENT $12,811 $30,000 Implemented
MI0348 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,851 $3,229 Implemented
MI0348 # 05 Y:2019 05 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,415 $18,468 Not Implemented
MI0348 # 06 Y:2019 06 2019 USE SOLAR HEAT TO HEAT WATER $4,487 $12,390 Not Implemented
MI0348 # 07 Y:2019 07 2019 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,470 $10,760 Not Implemented