Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
95
matching recommendationsSIC | 2834 | Pharmaceutical Preparations |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0545 # 05 Y:2017 | 05 | 2017 | INSULATE BARE EQUIPMENT | $954 | $449 | Implemented |
SD0545 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,972 | $8,850 | Not Implemented |
SD0545 # 01 Y:2017 | 01 | 2017 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $14,252 | $40,625 | Not Implemented |
SD0545 # 06 Y:2017 | 06 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $545 | $914 | Implemented |
SD0545 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $3,536 | $6,060 | Implemented |
SD0545 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,279 | $33,276 | Implemented |
SD0500 # 07 Y:2015 | 07 | 2015 | USE PHOTOCELL CONTROLS | $1,308 | $2,775 | Implemented |
SD0500 # 06 Y:2015 | 06 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,651 | $500 | Implemented |
SD0500 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,931 | $400 | Not Implemented |
SD0500 # 04 Y:2015 | 04 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,982 | $3,060 | Not Implemented |
SD0500 # 03 Y:2015 | 03 | 2015 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $9,500 | $500 | Not Implemented |
SD0500 # 02 Y:2015 | 02 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $105,336 | $417,200 | Implemented |
SD0500 # 01 Y:2015 | 01 | 2015 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $326,647 | $943,500 | Implemented |
SD0501 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,991 | $20,850 | Not Implemented |
SD0501 # 02 Y:2010 | 02 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,118 | $9,600 | Not Implemented |
SD0501 # 03 Y:2010 | 03 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $16,800 | $2,000 | Not Implemented |
SD0501 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,905 | $13,511 | Not Implemented |
SF0378 # 01 Y:2009 | 01 | 2009 | ADJUST VENTS TO MINIMIZE ENERGY USE | $4,936 | $0 | Not Implemented |
SF0378 # 02 Y:2009 | 02 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,697 | $0 | Implemented |
SF0378 # 03 Y:2009 | 03 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,063 | $500 | Implemented |
SF0378 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $559 | $840 | Not Implemented |
SF0378 # 08 Y:2009 | 08 | 2009 | USE PHOTOCELL CONTROLS | $771 | $1,925 | Not Implemented |
SF0378 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,409 | $12,868 | Not Implemented |
SF0378 # 04 Y:2009 | 04 | 2009 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $396 | $75 | Not Implemented |
SF0378 # 06 Y:2009 | 06 | 2009 | INSTALL OCCUPANCY SENSORS | $13,576 | $17,518 | Not Implemented |