IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 2834 Pharmaceutical Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0411 # 02 Y:2005 02 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $18,100 $1,500 Not Implemented
AS0411 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,306 $1,000 Implemented
AS0411 # 04 Y:2005 04 2005 UPGRADE CONTROLS ON COMPRESSORS $6,515 $10,000 Not Implemented
AS0411 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,783 $11,000 Not Implemented
AS0411 # 06 Y:2005 06 2005 REPAIR AND ELIMINATE STEAM LEAKS $4,077 $8,000 Implemented
AS0411 # 07 Y:2005 07 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $2,150 $991 Not Implemented
AS0411 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,988 $21,600 Not Implemented
NC0321 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,185 $5,475 Implemented
NC0321 # 01 Y:2005 01 2005 USE AUTOMATIC CLEANING EQUIPMENT $23,071 $15,000 Not Implemented
NC0321 # 03 Y:2005 03 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $19,559 $3,000 Implemented
NC0321 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $696 $50 Not Implemented
NC0321 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,543 $1,070 Implemented
NC0321 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $60 $179 Not Implemented
UF0364 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,126 $19,754 Implemented
UF0364 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,914 $406 Implemented
UF0364 # 03 Y:2005 03 2005 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,567 $94,000 Not Implemented
UF0364 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $572 $852 Not Implemented
UF0364 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $754 $0 Implemented
UF0364 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $809 $979 Not Implemented
UF0364 # 07 Y:2005 07 2005 RECYCLE FLUORESCENT LAMPS $459 $3,496 Not Implemented
UF0364 # 08 Y:2005 08 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,808 $957 Not Implemented
MI0107 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,128 $0 Implemented
MI0107 # 05 Y:2005 05 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,325 $42 Implemented
MI0107 # 04 Y:2005 04 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,012 $4,012 Implemented
MI0107 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,525 $100 Implemented