IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
SIC 2834 Pharmaceutical Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0041 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,751 $600 Implemented
NL0041 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $10,636 $52,000 Implemented
NL0041 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $238,833 $700,000 Implemented
NL0041 # 04 Y:2019 04 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,670 $100 Implemented
NL0041 # 05 Y:2019 05 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $5,000 $19,750 Implemented
NL0041 # 06 Y:2019 06 2019 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $2,618 $3,180 Not Implemented
NL0041 # 07 Y:2019 07 2019 REPAIR AND ELIMINATE STEAM LEAKS $2,123 $200 Implemented
NL0041 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197 $674 Implemented
SU0491 # 04 Y:2019 04 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $405 $542 Not Implemented
SU0491 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,429 $102,442 Not Implemented
SU0491 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $385 $1,387 Not Implemented
SU0491 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,086 $1,842 Not Implemented
SU0491 # 03 Y:2019 03 2019 REDUCE VENTILATION AIR $1,938 $934 Not Implemented
SU0491 # 02 Y:2019 02 2019 ELIMINATE/REDUCE AN OPERATION $4,160 $940 Not Implemented
SU0491 # 01 Y:2019 01 2019 DISCONNECT BALLASTS $1,603 $0 Not Implemented
GT0934 # 06 Y:2019 06 2019 USE SOLAR HEAT FOR HEAT $37,938 $246,597 Implemented
GT0934 # 01 Y:2019 01 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,153 $250 Implemented
GT0934 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $2,334 $1,238 Implemented
GT0934 # 03 Y:2019 03 2019 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $9,210 $19,899 Not Implemented
GT0934 # 04 Y:2019 04 2019 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $305,911 $903,775 Not Implemented
GT0934 # 05 Y:2019 05 2019 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $445 $2,770 Implemented
LE0482 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,428 $1,040 Implemented
LE0482 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $743 $2,613 Implemented
LE0482 # 07 Y:2019 07 2019 REPLACE BOILER $45,608 $325,000 Not Implemented
LE0482 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,620 $18,280 Implemented