Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsSIC | 2834 | Pharmaceutical Preparations |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0041 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,751 | $600 | Implemented |
NL0041 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $10,636 | $52,000 | Implemented |
NL0041 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $238,833 | $700,000 | Implemented |
NL0041 # 04 Y:2019 | 04 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,670 | $100 | Implemented |
NL0041 # 05 Y:2019 | 05 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $5,000 | $19,750 | Implemented |
NL0041 # 06 Y:2019 | 06 | 2019 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $2,618 | $3,180 | Not Implemented |
NL0041 # 07 Y:2019 | 07 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $2,123 | $200 | Implemented |
NL0041 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $197 | $674 | Implemented |
SU0491 # 04 Y:2019 | 04 | 2019 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $405 | $542 | Not Implemented |
SU0491 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,429 | $102,442 | Not Implemented |
SU0491 # 07 Y:2019 | 07 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $385 | $1,387 | Not Implemented |
SU0491 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,086 | $1,842 | Not Implemented |
SU0491 # 03 Y:2019 | 03 | 2019 | REDUCE VENTILATION AIR | $1,938 | $934 | Not Implemented |
SU0491 # 02 Y:2019 | 02 | 2019 | ELIMINATE/REDUCE AN OPERATION | $4,160 | $940 | Not Implemented |
SU0491 # 01 Y:2019 | 01 | 2019 | DISCONNECT BALLASTS | $1,603 | $0 | Not Implemented |
GT0934 # 06 Y:2019 | 06 | 2019 | USE SOLAR HEAT FOR HEAT | $37,938 | $246,597 | Implemented |
GT0934 # 01 Y:2019 | 01 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,153 | $250 | Implemented |
GT0934 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $2,334 | $1,238 | Implemented |
GT0934 # 03 Y:2019 | 03 | 2019 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $9,210 | $19,899 | Not Implemented |
GT0934 # 04 Y:2019 | 04 | 2019 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $305,911 | $903,775 | Not Implemented |
GT0934 # 05 Y:2019 | 05 | 2019 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $445 | $2,770 | Implemented |
LE0482 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,428 | $1,040 | Implemented |
LE0482 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $743 | $2,613 | Implemented |
LE0482 # 07 Y:2019 | 07 | 2019 | REPLACE BOILER | $45,608 | $325,000 | Not Implemented |
LE0482 # 06 Y:2019 | 06 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,620 | $18,280 | Implemented |