Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 2834 | Pharmaceutical Preparations |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0436 # 09 Y:2023 | 09 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,045 | $0 | Implemented |
MI0436 # 08 Y:2023 | 08 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,021 | $199 | Implemented |
MI0436 # 07 Y:2023 | 07 | 2023 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $2,508 | $0 | Implemented |
MI0436 # 06 Y:2023 | 06 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $3,663 | $3,360 | Implemented |
MI0436 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,785 | $13,440 | Implemented |
MI0436 # 01 Y:2023 | 01 | 2023 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $3,141,406 | $1,000,000 | Implemented |
MI0436 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,029 | $480 | Implemented |
MI0436 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,894 | $1,980 | Implemented |
MI0436 # 04 Y:2023 | 04 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,903 | $1,827 | Implemented |
OR0779 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $4,725 | $57,101 | Not Implemented |
OR0779 # 03 Y:2023 | 03 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $43,575 | $54,837 | Not Implemented |
OR0779 # 02 Y:2023 | 02 | 2023 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,749 | $0 | Not Implemented |
OR0779 # 01 Y:2023 | 01 | 2023 | ELIMINATE/REDUCE AN OPERATION | $3,315 | $0 | Not Implemented |
LE0546 # 09 Y:2023 | 09 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,528 | $27,000 | Not Implemented |
LE0546 # 08 Y:2023 | 08 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,440 | $23,030 | Not Implemented |
LE0546 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $15,770 | $50,000 | Not Implemented |
LE0546 # 06 Y:2023 | 06 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $14,194 | $40,000 | Not Implemented |
LE0546 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,099 | $2,000 | Not Implemented |
LE0546 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,746 | $72,400 | Not Implemented |
LE0546 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,997 | $20,300 | Not Implemented |
LE0546 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $43,220 | $20,000 | Not Implemented |
LE0546 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,482 | $4,500 | Not Implemented |