IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 2836 Biological Products Exc. Diagnostic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0696 # 01 Y:2014 01 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $9,930 $22,200 Not Implemented
CO0696 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,140 $500 Implemented
CO0696 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,870 $6,360 Not Implemented
CO0696 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $310 $480 Implemented
CO0521 # 01 Y:2003 01 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $65,190 $82,000 Not Implemented
CO0521 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,840 $5,100 Not Implemented
CO0521 # 03 Y:2003 03 2003 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,010 $1,400 Implemented
CO0521 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $200 Implemented
CO0521 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,650 $3,532 Not Implemented
CO0521 # 06 Y:2003 06 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $48,290 $175,000 Not Implemented
CO0520 # 01 Y:2003 01 2003 USE POWER DURING OFF-PEAK PERIODS $12,470 $10,000 Not Implemented
CO0520 # 02 Y:2003 02 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $10,530 $39,900 Not Implemented
CO0520 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $304 $508 Not Implemented
CO0520 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,460 $260 Implemented
CO0520 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $410 $260 Not Implemented