IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
SIC 284 Soap, Cleaners, And Toilet Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0388 # 04 Y:2015 04 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,556 $3,052 Not Implemented
LE0388 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,333 $20,147 Implemented
LE0388 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,432 $16,500 Not Implemented
LE0388 # 07 Y:2015 07 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,735 $9,703 Not Implemented
LE0388 # 08 Y:2015 08 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $272 $1,200 Implemented
LE0347 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $653 $2,000 Implemented
LE0347 # 05 Y:2012 05 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,309 $20,000 Implemented
LE0347 # 07 Y:2012 07 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,814 $9,000 Not Implemented
LE0347 # 06 Y:2012 06 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $10,156 $16,300 Implemented
LE0347 # 08 Y:2012 08 2012 REPAIR AND ELIMINATE STEAM LEAKS $475 $675 Implemented
LE0347 # 09 Y:2012 09 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $988 $4,050 Not Implemented
LE0347 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,060 $40 Implemented
LE0347 # 03 Y:2012 03 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,115 $0 Not Implemented
LE0347 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,654 $1,000 Implemented
HO0125 # 01 Y:1996 01 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,210 $1,200 Implemented
HO0125 # 04 Y:1996 04 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,400 $5,000 Not Implemented
HO0125 # 03 Y:1996 03 1996 REPAIR AND ELIMINATE STEAM LEAKS $175 $100 Implemented
HO0125 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,138 $9,130 Implemented
HO0122 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $1,151 $400 Not Implemented
HO0122 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $773 $1,733 Implemented
HO0122 # 02 Y:1995 02 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $332 $0 Not Implemented
HO0122 # 03 Y:1995 03 1995 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,952 $750 Implemented
HO0117 # 03 Y:1995 03 1995 KEEP BOILER TUBES CLEAN $5,227 $220 Implemented
HO0117 # 05 Y:1995 05 1995 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,237 $500 Not Implemented
HO0117 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,328 $250 Implemented