Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
1,001
matching recommendationsSIC | 284 | Soap, Cleaners, And Toilet Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0475 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,084 | $1,166 | Not Implemented |
AS0475 # 06 Y:2019 | 06 | 2019 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $411 | $236 | Not Implemented |
AS0475 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $159 | $752 | Implemented |
AS0475 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $110 | $23 | Not Implemented |
IP0113 # 01 Y:2019 | 01 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,753 | $0 | Not Implemented |
IP0113 # 02 Y:2019 | 02 | 2019 | COMBINE UTILITY METERS | $1,625 | $0 | Not Implemented |
IP0113 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,595 | $4 | Not Implemented |
IP0113 # 04 Y:2019 | 04 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $783 | $0 | Not Implemented |
IP0113 # 05 Y:2019 | 05 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $629 | $0 | Not Implemented |
IP0113 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,196 | $72 | Implemented |
IP0113 # 07 Y:2019 | 07 | 2019 | USE PHOTOCELL CONTROLS | $151 | $71 | Implemented |
IP0113 # 08 Y:2019 | 08 | 2019 | INSTALL OCCUPANCY SENSORS | $591 | $501 | Implemented |
IP0113 # 09 Y:2019 | 09 | 2019 | OPTIMIZE PLANT POWER FACTOR | $1,564 | $876 | Not Implemented |
IP0113 # 10 Y:2019 | 10 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $775 | $765 | Not Implemented |
IP0113 # 11 Y:2019 | 11 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $476 | $1,343 | Implemented |
IP0113 # 12 Y:2019 | 12 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $892 | $2,129 | Not Implemented |
IP0113 # 13 Y:2019 | 13 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,555 | $21,000 | Not Implemented |
MI0344 # 01 Y:2018 | 01 | 2018 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $55,478 | $62,800 | Not Implemented |
MI0344 # 02 Y:2018 | 02 | 2018 | OPTIMIZE PLANT POWER FACTOR | $12,638 | $18,415 | Not Implemented |
MI0344 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,405 | $6,666 | Implemented |
MI0344 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,313 | $15,147 | Implemented |
MI0344 # 05 Y:2018 | 05 | 2018 | INSULATE BARE EQUIPMENT | $7,317 | $9,570 | Not Implemented |
MI0344 # 06 Y:2018 | 06 | 2018 | USE PHOTOCELL CONTROLS | $3,042 | $2,219 | Implemented |
MI0344 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,495 | $2,030 | Implemented |
MI0344 # 08 Y:2018 | 08 | 2018 | INSTALL OCCUPANCY SENSORS | $1,536 | $846 | Implemented |