IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
SIC 284 Soap, Cleaners, And Toilet Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0722 # 01 Y:2001 01 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $16,455 $5,110 Implemented
GT0722 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $851 $2,902 Implemented
GT0722 # 05 Y:2001 05 2001 INSULATE FEEDWATER TANK $153 $220 Implemented
GT0545 # 01 Y:1994 01 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $25,370 $0 Implemented
GT0545 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,800 $14,340 Implemented
GT0545 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,480 $3,780 Implemented
GT0545 # 05 Y:1994 05 1994 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,400 $12,000 Implemented
GT0350 # 01 Y:1988 01 1988 REDESIGN PROCESS $20,803 $89,500 Implemented
GT0350 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $2,140 $1,730 Implemented
GT0350 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,300 $9,000 Implemented
GT0350 # 05 Y:1988 05 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $280 $100 Implemented
GT0350 # 06 Y:1988 06 1988 INSTALL SET-BACK TIMERS $1,090 $0 Implemented
GT0350 # 07 Y:1988 07 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,194 $1,680 Implemented
GT0291 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,434 $500 Implemented
GT0291 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $142 $63 Implemented
GT0291 # 03 Y:1986 03 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $528 $600 Implemented