Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
108
matching recommendationsSIC | 284 | Soap, Cleaners, And Toilet Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0482 # 04 Y:2017 | 04 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,040 | $390 | n/a |
UM0482 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,675 | $3,000 | n/a |
UM0482 # 01 Y:2017 | 01 | 2017 | INSTALL OCCUPANCY SENSORS | $26,386 | $13,350 | n/a |
UM0482 # 02 Y:2017 | 02 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,148 | $2,000 | n/a |
UD0934 # 01 Y:2015 | 01 | 2015 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $51,417 | $0 | Not Implemented |
UD0934 # 08 Y:2015 | 08 | 2015 | REDUCE VENTILATION AIR | $11,488 | $18,984 | Not Implemented |
UD0934 # 05 Y:2015 | 05 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,084 | $2,000 | Implemented |
UD0934 # 10 Y:2015 | 10 | 2015 | INSTALL OCCUPANCY SENSORS | $1,058 | $330 | Implemented |
UD0934 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,235 | $5,300 | Not Implemented |
UD0934 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,363 | $2,700 | Not Implemented |
UD0934 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,672 | $18,125 | Not Implemented |
UD0934 # 03 Y:2015 | 03 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $250 | $224 | Implemented |
UD0934 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,944 | $75,059 | Implemented |
UD0934 # 02 Y:2015 | 02 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,375 | $0 | Not Implemented |
UD0921 # 12 Y:2015 | 12 | 2015 | CLEAN FOULING FROM WATER LINES REGULARLY | $4,725 | $11,000 | Not Implemented |
UD0921 # 01 Y:2015 | 01 | 2015 | REDUCE VENTILATION AIR | $16,159 | $0 | Implemented |
UD0921 # 02 Y:2015 | 02 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $405 | $0 | Implemented |
UD0921 # 03 Y:2015 | 03 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $723 | $0 | Not Implemented |
UD0921 # 04 Y:2015 | 04 | 2015 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $381 | $275 | Implemented |
UD0921 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,887 | $950 | Implemented |
UD0921 # 06 Y:2015 | 06 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,838 | $1,250 | Not Implemented |
UD0921 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,470 | $1,000 | Not Implemented |
UD0921 # 08 Y:2015 | 08 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,618 | $700 | Not Implemented |
UD0921 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,190 | $4,300 | Not Implemented |
UD0921 # 10 Y:2015 | 10 | 2015 | INSULATE BARE EQUIPMENT | $3,379 | $8,000 | Implemented |