IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

237

matching recommendations
Reset
SIC 2841 Soap And Other Detergents
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0690 # 09 Y:2025 09 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,747 $8,115 n/a
WV0690 # 11 Y:2025 11 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $648 $782 n/a
WV0690 # 04 Y:2025 04 2025 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,161 $28,584 n/a
WV0690 # 01 Y:2025 01 2025 REDUCE VENTILATION AIR $61,627 $6,564 n/a
WV0690 # 12 Y:2025 12 2025 INSULATE BARE EQUIPMENT $224 $391 n/a
WV0690 # 10 Y:2025 10 2025 INSTALL OCCUPANCY SENSORS $1,342 $3,197 n/a
WV0690 # 05 Y:2025 05 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,095 $308 n/a
WV0690 # 08 Y:2025 08 2025 REPAIR OR REPLACE STEAM TRAPS $1,772 $8,336 n/a
WV0690 # 07 Y:2025 07 2025 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,735 $1,187 n/a
WV0690 # 06 Y:2025 06 2025 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,997 $12,500 n/a
WV0690 # 02 Y:2025 02 2025 UPGRADE CONTROLS ON COMPRESSORS $6,659 $13,993 n/a
WV0690 # 03 Y:2025 03 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,537 $11,140 n/a
IC0279 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $58,649 $36,118 Not Implemented
IC0279 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,146 $4,937 Implemented
IC0279 # 11 Y:2023 11 2023 REPAIR AND ELIMINATE STEAM LEAKS $10,359 $750 Implemented
IC0279 # 10 Y:2023 10 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $610,617 $3,463,096 Not Implemented
IC0279 # 04 Y:2023 04 2023 INCREASE AMOUNT OF CONDENSATE RETURNED $89,401 $210,300 Not Implemented
IC0279 # 09 Y:2023 09 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $159,499 $2,716,228 Not Implemented
IC0279 # 06 Y:2023 06 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $26,751 $41,956 Not Implemented
IC0279 # 07 Y:2023 07 2023 OPERATE BOILERS ON HIGH FIRE SETTING $3,858 $72 Not Implemented
IC0279 # 03 Y:2023 03 2023 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $205,098 $12,050 Not Implemented
IC0279 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $2,613 $254 Implemented
IC0279 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $538 $1,455 Implemented
IP0149 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $982 $120 Implemented
IP0149 # 06 Y:2021 06 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,621 $2,279 Not Implemented