Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 2841 | Soap And Other Detergents |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0279 # 09 Y:2019 | 09 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,523 | $1,080 | Not Implemented |
MZ0279 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,601 | $220 | Not Implemented |
MZ0279 # 07 Y:2019 | 07 | 2019 | INSTALL SPECTRAL REFLECTORS / DELAMP | $19,835 | $25,600 | Implemented |
MZ0279 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $428 | $1,464 | Implemented |
MZ0279 # 05 Y:2019 | 05 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,719 | $14,400 | Implemented |
MZ0279 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,794 | $6,252 | Implemented |
MZ0279 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,014 | $640 | Implemented |
MZ0279 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $78,987 | $1,980 | Not Implemented |
MZ0279 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,031 | $4,700 | Implemented |
MZ0003 # 06 Y:2007 | 06 | 2007 | ADD AREA LIGHTING SWITCHES | $3,995 | $500 | Not Implemented |
MZ0003 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $5,992 | $2,950 | Not Implemented |
MZ0003 # 04 Y:2007 | 04 | 2007 | DISCONNECT BALLASTS | $45,032 | $4,012 | Not Implemented |
MZ0003 # 03 Y:2007 | 03 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,859 | $30,000 | Not Implemented |
MZ0003 # 02 Y:2007 | 02 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,702 | $7,764 | Not Implemented |
MZ0003 # 01 Y:2007 | 01 | 2007 | REPLACE BOILER | $237,208 | $220,000 | Not Implemented |
MO0259 # 07 Y:1999 | 07 | 1999 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $13,260 | $1,732 | Implemented |
MO0259 # 06 Y:1999 | 06 | 1999 | ADOPT IN-HOUSE MATERIAL GENERATION | $32,625 | $75,000 | Not Implemented |
MO0259 # 05 Y:1999 | 05 | 1999 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $48 | $80 | Implemented |
MO0259 # 04 Y:1999 | 04 | 1999 | REDUCE GLAZED AREAS IN BUILDINGS | $407 | $1,000 | Not Implemented |
MO0259 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,994 | $4,410 | Implemented |
MO0259 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,876 | $566 | Implemented |
MO0259 # 01 Y:1999 | 01 | 1999 | REPLACE BOILER | $16,318 | $2,000 | Implemented |
MO0029 # 01 Y:1991 | 01 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,050 | $75 | Implemented |
MO0029 # 09 Y:1991 | 09 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $96 | $0 | Implemented |
MO0029 # 08 Y:1991 | 08 | 1991 | INSULATE BARE EQUIPMENT | $879 | $213 | Implemented |