IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 2841 Soap And Other Detergents
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0921 # 12 Y:2015 12 2015 CLEAN FOULING FROM WATER LINES REGULARLY $4,725 $11,000 Not Implemented
UD0921 # 11 Y:2015 11 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,030 $6,052 Not Implemented
UD0921 # 10 Y:2015 10 2015 INSULATE BARE EQUIPMENT $3,379 $8,000 Implemented
UD0921 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,190 $4,300 Not Implemented
UD0921 # 08 Y:2015 08 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,618 $700 Not Implemented
UD0921 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,470 $1,000 Not Implemented
UD0921 # 06 Y:2015 06 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,838 $1,250 Not Implemented
UD0921 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,887 $950 Implemented
UD0921 # 04 Y:2015 04 2015 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $381 $275 Implemented
UD0921 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $723 $0 Not Implemented
UD0921 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $405 $0 Implemented
UD0921 # 01 Y:2015 01 2015 REDUCE VENTILATION AIR $16,159 $0 Implemented
UD0598 # 08 Y:2000 08 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,720 $500 Implemented
UD0598 # 09 Y:2000 09 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,088 $4,253 Implemented
UD0598 # 07 Y:2000 07 2000 INSTALL OCCUPANCY SENSORS $1,752 $726 Not Implemented
UD0598 # 06 Y:2000 06 2000 USE MINIMUM STEAM OPERATING PRESSURE $3,333 $0 Implemented
UD0598 # 05 Y:2000 05 2000 CHECK FOR ACCURACY OF UTILITY / POWER METERS $9,640 $0 Implemented
UD0598 # 04 Y:2000 04 2000 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS $13,603 $0 Not Implemented
UD0598 # 03 Y:2000 03 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $15,756 $18,000 Not Implemented
UD0598 # 02 Y:2000 02 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $22,073 $34,288 Implemented
UD0598 # 01 Y:2000 01 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $1,210,579 $375,000 Not Implemented
UD0171 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,744 $12,000 Not Implemented
UD0171 # 03 Y:1985 03 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $10,662 $38,000 Not Implemented
UD0171 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,014 $17,000 Implemented
UD0171 # 01 Y:1985 01 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,352 $4,773 Implemented