Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 2841 Soap And Other Detergents
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0149 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $982 $120 Implemented
IP0149 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,309 $8,100 Not Implemented
IP0149 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $416 $380 Implemented
IP0149 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $330 $450 Implemented
IP0149 # 06 Y:2021 06 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,621 $2,279 Not Implemented
IP0149 # 07 Y:2021 07 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,813 $8,000 Not Implemented
IP0149 # 08 Y:2021 08 2021 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $8,424 $30,935 Not Implemented
IP0149 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,671 $95 Implemented
SD0611 # 07 Y:2021 07 2021 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,308 $6,000 Implemented
SD0611 # 06 Y:2021 06 2021 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $45,722 $186,400 Implemented
SD0611 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $203 $387 Implemented
SD0611 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,424 $1,815 Not Implemented
SD0611 # 03 Y:2021 03 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,824 $24,300 Not Implemented
SD0611 # 02 Y:2021 02 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,709 $10,350 Not Implemented
SD0611 # 01 Y:2021 01 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $30,193 $22,050 Implemented
LE0505 # 07 Y:2021 07 2021 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $51,715 $200,000 Not Implemented
LE0505 # 06 Y:2021 06 2021 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $48,123 $90,000 Implemented
LE0505 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,327 $20,855 Implemented
LE0505 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $62,020 $55,000 Implemented
LE0505 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,439 $31,000 Implemented
LE0505 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,651 $10,100 Implemented
LE0505 # 01 Y:2021 01 2021 REPAIR OR REPLACE STEAM TRAPS $72,824 $26,000 Implemented