IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

488

matching recommendations
Reset
SIC 2844 Toilet Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0224 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $1,215 $583 Implemented
WV0224 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $1,103 $120 Implemented
WV0224 # 07 Y:2001 07 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,668 $2,160 Implemented
WV0224 # 08 Y:2001 08 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,361 $2,160 Implemented
WV0224 # 09 Y:2001 09 2001 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,176 $31,000 Not Implemented
WV0224 # 10 Y:2001 10 2001 RECYCLE WHITE WATER $4,614 $1,767 Not Implemented
WV0224 # 11 Y:2001 11 2001 RECOVER AND REUSE COOLING WATER $25,740 $89,000 Implemented
WV0224 # 12 Y:2001 12 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $20,000 $14,000 Not Implemented
WV0224 # 13 Y:2001 13 2001 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $100,800 $19,200 Not Implemented
AM0347 # 01 Y:1999 01 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $675,000 $51,000 Implemented
AM0347 # 02 Y:1999 02 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $76,360 $175,000 Not Implemented
AM0347 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,540 $300 Implemented
AM0347 # 04 Y:1999 04 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,700 $0 Not Implemented
AM0347 # 05 Y:1999 05 1999 PAY BILLS ON TIME TO AVOID LATE FEES $1,213 $0 Implemented
AM0347 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $980 $1,840 Implemented
AM0347 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $845 $850 Implemented
AM0347 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $830 $180 Implemented
AM0347 # 09 Y:1999 09 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $770 $500 Implemented
AM0347 # 10 Y:1999 10 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $280 $36 Implemented
SF0114 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,586 $10,740 Implemented
SF0114 # 02 Y:1997 02 1997 USE PHOTOCELL CONTROLS $1,321 $1,000 Not Implemented
SF0114 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $235 $480 Not Implemented
SF0114 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $417 $675 Implemented
SF0114 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $181 $260 Implemented
SF0114 # 06 Y:1997 06 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $338 $920 Implemented