IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

498

matching recommendations
Reset
SIC 2844 Toilet Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0347 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $845 $850 Implemented
AM0347 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $830 $180 Implemented
AM0347 # 09 Y:1999 09 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $770 $500 Implemented
AM0347 # 10 Y:1999 10 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $280 $36 Implemented
SF0114 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,586 $10,740 Implemented
SF0114 # 02 Y:1997 02 1997 USE PHOTOCELL CONTROLS $1,321 $1,000 Not Implemented
SF0114 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $235 $480 Not Implemented
SF0114 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $417 $675 Implemented
SF0114 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $181 $260 Implemented
SF0114 # 06 Y:1997 06 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $338 $920 Implemented
SF0114 # 07 Y:1997 07 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $13,910 $0 Implemented
SF0114 # 08 Y:1997 08 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $500 $200 Implemented
KG0051 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,350 $3,820 Not Implemented
KG0051 # 02 Y:1996 02 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,473 $2,080 Not Implemented
KG0051 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,014 $1,052 Not Implemented
KG0051 # 04 Y:1996 04 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,751 $1,500 Not Implemented
KG0051 # 05 Y:1996 05 1996 INSTALL TIMERS AND/OR THERMOSTATS $1,859 $450 Not Implemented
KG0051 # 06 Y:1996 06 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,464 $1,120 Not Implemented
KG0051 # 07 Y:1996 07 1996 USE SYNTHETIC LUBRICANT $1,354 $0 Not Implemented
KG0051 # 08 Y:1996 08 1996 MINIMIZE WATER USAGE $27,720 $3,283 Not Implemented
KG0051 # 09 Y:1996 09 1996 RECOVER AND REUSE WASTE MATERIAL $2,930 $75 Not Implemented
KG0051 # 10 Y:1996 10 1996 RECOVER AND REUSE WASTE MATERIAL $2,044 $0 Not Implemented
HO0125 # 01 Y:1996 01 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,210 $1,200 Implemented
HO0125 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,138 $9,130 Implemented
HO0125 # 03 Y:1996 03 1996 REPAIR AND ELIMINATE STEAM LEAKS $175 $100 Implemented