Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

765

matching recommendations
Reset
SIC 285 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0337 # 05 Y:2025 05 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,274 $12,000 n/a
TT0337 # 08 Y:2025 08 2025 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $108,000 $12,300 n/a
TT0337 # 04 Y:2025 04 2025 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $210 $500 n/a
TT0337 # 06 Y:2025 06 2025 IMPROVE COMBUSTION CONTROL CAPABILITY $2,372 $1,000 n/a
TT0337 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,154 $1,570 n/a
TT0337 # 01 Y:2025 01 2025 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,309 $1,884 n/a
TT0337 # 09 Y:2025 09 2025 RECOVER WASTE HEAT FROM EQUIPMENT $2,714 $5,000 n/a
TT0337 # 02 Y:2025 02 2025 CONVERT TO OXYFUEL BURNERS $37,798 $25,000 n/a
TT0337 # 07 Y:2025 07 2025 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,382 $16,500 n/a
OR0807 # 03 Y:2025 03 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $753 $2,323 n/a
OR0807 # 02 Y:2025 02 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,721 $7,534 n/a
OR0807 # 01 Y:2025 01 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,168 $10,530 n/a
OR0807 # 04 Y:2025 04 2025 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,635 $16,079 n/a
WM0225 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,246 $1,375 Not Implemented
WM0225 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,067 $5,244 Not Implemented
WM0225 # 01 Y:2024 01 2024 PREHEAT COMBUSTION AIR WITH WASTE HEAT $43,885 $200,000 Not Implemented
WM0225 # 04 Y:2024 04 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,687 $4,037 Not Implemented
WM0225 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $25,176 $0 Not Implemented
UD1089 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,974 $0 Implemented
UD1089 # 02 Y:2024 02 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $30,384 $0 Not Implemented
UD1089 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $472 $550 Not Implemented
UD1089 # 06 Y:2024 06 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,228 $27,650 Not Implemented
UD1089 # 01 Y:2024 01 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $79,860 $0 Not Implemented
UD1089 # 04 Y:2024 04 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,169 $2,030 Not Implemented
KS2208 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $76,472 $602,376 Not Implemented