IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

741

matching recommendations
Reset
SIC 285 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0886 # 01 Y:2013 01 2013 MINIMIZE WATER USAGE $32,244 $1,000 Not Implemented
UD0886 # 02 Y:2013 02 2013 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,317 $1,000 Not Implemented
UD0886 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,238 $7,500 Not Implemented
UD0886 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,782 $50,000 Not Implemented
UD0886 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,028 $0 Not Implemented
UD0886 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,761 $0 Not Implemented
UD0886 # 07 Y:2013 07 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $36,728 $14,900 Implemented
UD0886 # 08 Y:2013 08 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $4,035 $3,550 Not Implemented
UD0886 # 09 Y:2013 09 2013 UPGRADE CONTROLS ON COMPRESSORS $16,109 $27,000 Not Implemented
UD0886 # 10 Y:2013 10 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $575 $1,000 Not Implemented
UD0886 # 11 Y:2013 11 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $341 $0 Implemented
UD0886 # 12 Y:2013 12 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,648 $6,720 Implemented
UD0886 # 13 Y:2013 13 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,167 $0 Not Implemented
UD0886 # 14 Y:2013 14 2013 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $2,995 $0 Implemented
UD0886 # 15 Y:2013 15 2013 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $9,716 $30,000 Not Implemented
UD0886 # 16 Y:2013 16 2013 REDUCE VENTILATION AIR $32,467 $20,000 Not Implemented
BD0423 # 12 Y:2013 12 2013 REGENERATE CLEANING SOLVENT ON-SITE AND REUSE $44,983 $302,000 Not Implemented
BD0423 # 11 Y:2013 11 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $173 $250 Implemented
BD0423 # 10 Y:2013 10 2013 INSTALL TURBULATORS $543 $115 Not Implemented
BD0423 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $975 $1,500 Implemented
BD0423 # 08 Y:2013 08 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $838 $3,250 Not Implemented
BD0423 # 07 Y:2013 07 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,404 $2,000 Not Implemented
BD0423 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $3,795 $9,000 Not Implemented
BD0423 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,616 $20 Not Implemented
BD0423 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,565 $4,565 Implemented