Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 285 | Paints And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0255 # 02 Y:2004 | 02 | 2004 | INSTALL REPLACEMENT DOORS | $13,961 | $14,000 | Not Implemented |
BD0255 # 15 Y:2004 | 15 | 2004 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,190 | $0 | Not Implemented |
BD0255 # 14 Y:2004 | 14 | 2004 | AUTOMATE PAYROLL SYSTEM | $6,240 | $3,000 | Not Implemented |
BD0255 # 13 Y:2004 | 13 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,428 | $2,000 | Not Implemented |
BD0255 # 12 Y:2004 | 12 | 2004 | INSTALL OCCUPANCY SENSORS | $570 | $150 | Not Implemented |
BD0255 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $739 | $995 | Not Implemented |
BD0255 # 10 Y:2004 | 10 | 2004 | INSTALL TURBULATORS | $899 | $1,200 | Not Implemented |
BD0255 # 09 Y:2004 | 09 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,069 | $1,500 | Not Implemented |
BD0255 # 08 Y:2004 | 08 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,238 | $750 | Not Implemented |
BD0255 # 07 Y:2004 | 07 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,586 | $2,000 | Not Implemented |
BD0255 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $2,761 | $2,550 | Not Implemented |
BD0255 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,780 | $2,000 | Not Implemented |
BD0255 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,576 | $13,050 | Not Implemented |
BD0255 # 03 Y:2004 | 03 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $11,914 | $11,000 | Not Implemented |
BD0255 # 01 Y:2004 | 01 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,352 | $17,885 | Not Implemented |
IC0075 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,225 | $17,812 | Not Implemented |
IC0075 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,794 | $12,470 | Not Implemented |
IC0075 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $4,538 | $6,945 | Not Implemented |
IC0075 # 04 Y:2004 | 04 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,658 | $3,832 | Not Implemented |
IC0075 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,066 | $0 | Not Implemented |
IC0075 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,878 | $6,154 | Not Implemented |
IC0075 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,105 | $2,900 | Implemented |