IAC Assessment: BD0255
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0255
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2004
Principal Product Industrial Coatings
NAICS 325510 - Paint and Coating Manufacturing
SIC 2851 - Paints And Allied Products
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 60,000
Annual Production 23,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $207,689 3,738,240 kWh $0.06
Electricity Demand $82,852 8,210 kW-months/year $10.09
Natural Gas $71,679 11,712 MMBtu $6.12
TOTAL ENERGY COSTS $365,994
RECOMMENDED SAVINGS* $84,303 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$16,352
Cost:
$17,885
$10,814 380,765 $5,538 549 - - - - - - - - $10,814
380,765
kWh
$5,538
549
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.7495 INSTALL REPLACEMENT DOORS Savings:
$13,961
Cost:
$14,000
- - - - $821 140 $13,140 - - - - - -
-
kWh
-
-
kW-months/year
$821
140
MMBtu
$13,140
-
$
-
-
$
-
-
$
03: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$11,914
Cost:
$11,000
$8,450 297,550 $3,464 343 - - - - - - - - $8,450
297,550
kWh
$3,464
343
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,576
Cost:
$13,050
$4,501 158,480 $3,075 305 - - - - - - - - $4,501
158,480
kWh
$3,075
305
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,780
Cost:
$2,000
$2,539 89,414 $1,241 123 - - - - - - - - $2,539
89,414
kWh
$1,241
123
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,761
Cost:
$2,550
$1,045 36,730 $1,525 151 - - $35 - - - $156 - $1,045
36,730
kWh
$1,525
151
kW-months/year
-
-
MMBtu
$35
-
$
-
-
$
$156
-
$
07: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$2,586
Cost:
$2,000
- - - - $2,586 444 - - - - - - -
-
kWh
-
-
kW-months/year
$2,586
444
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,238
Cost:
$750
$834 29,738 $404 40 - - - - - - - - $834
29,738
kWh
$404
40
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,069
Cost:
$1,500
- - - - $1,069 183 - - - - - - -
-
kWh
-
-
kW-months/year
$1,069
183
MMBtu
-
-
$
-
-
$
-
-
$
10: 2.1222 INSTALL TURBULATORS Savings:
$899
Cost:
$1,200
- - - - $899 153 - - - - - - -
-
kWh
-
-
kW-months/year
$899
153
MMBtu
-
-
$
-
-
$
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$739
Cost:
$995
$236 8,299 $160 16 - - $144 - - - $199 - $236
8,299
kWh
$160
16
kW-months/year
-
-
MMBtu
$144
-
$
-
-
$
$199
-
$
12: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$570
Cost:
$150
$318 11,190 $252 25 - - - - - - - - $318
11,190
kWh
$252
25
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
13: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$12,428
Cost:
$2,000
- - $12,428 1,232 - - - - - - - - -
-
kWh
$12,428
1,232
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
14: 4.4470 AUTOMATE PAYROLL SYSTEM Savings:
$6,240
Cost:
$3,000
- - - - - - $6,240 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,240
-
$
-
-
$
-
-
$
15: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$2,190
Cost:
-
- - - - - - - - $2,190 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$2,190
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$84,303
Cost:
$72,080
$28,737 1,012,166 $28,087 2,784 $5,375 920 $19,559 - $2,190 - $355 - $28,737
1,012,166
kWh
$28,087
2,784
kW-months/year
$5,375
920
MMBtu
$19,559
-
$
$2,190
-
$
$355
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material