IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 285 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0978 # 03 Y:2017 03 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,233 $2,000 Implemented
OK0978 # 04 Y:2017 04 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $988 $4,800 Not Implemented
OK0978 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $7,833 $2,777 Not Implemented
OK0978 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,519 $410 Not Implemented
OK0978 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,821 $27,209 Implemented
OK0978 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,821 $74,753 Not Implemented
OK0978 # 11 Y:2017 11 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,391 $3,600 Not Implemented
OK0978 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,046 $1,446 Implemented
OK0978 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $18,551 $40,582 Not Implemented
OK0978 # 10 Y:2017 10 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $19,215 $0 Not Implemented
OK0978 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,546 $20,000 Not Implemented
OK0786 # 05 Y:2010 05 2010 INSTALL TIMERS AND/OR THERMOSTATS $1,491 $465 Implemented
OK0786 # 06 Y:2010 06 2010 CHECK FOR ACCURACY OF UTILITY / POWER METERS $903 $0 Implemented
OK0786 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $854 $0 Implemented
OK0786 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $453 $3,410 Not Implemented
OK0786 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106 $604 Not Implemented
OK0786 # 01 Y:2010 01 2010 OPERATE BOILERS ON HIGH FIRE SETTING $2,348 $24,000 Not Implemented
KU0145 # 15 Y:1984 15 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $4,262 $3,348 Not Implemented
KU0145 # 14 Y:1984 14 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $134 $350 Implemented
KU0145 # 13 Y:1984 13 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $847 $250 Implemented
KU0145 # 12 Y:1984 12 1984 INSTALL AUTOMATIC STACK DAMPER $2,255 $2,000 Not Implemented
KU0145 # 08 Y:1984 08 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,299 $3,290 Not Implemented
KU0145 # 06 Y:1984 06 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $165 $450 Implemented
KU0145 # 05 Y:1984 05 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $226 $20 Not Implemented
KU0145 # 03 Y:1984 03 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,901 $4,000 Not Implemented