IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 2851 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0405 # 04 Y:2010 04 2010 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $31,421 $0 Not Implemented
NC0405 # 03 Y:2010 03 2010 DEVELOP A REPAIR/REPLACE POLICY $1,096 $4,858 Not Implemented
NC0405 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $900 $100 Implemented
NC0405 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $227 $200 Implemented
DL0049 # 02 Y:2010 02 2010 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $35,889 $1,500 Implemented
DL0049 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $43,192 $2,000 Implemented
DL0049 # 04 Y:2010 04 2010 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $7,180 $1,000 Implemented
DL0049 # 05 Y:2010 05 2010 REPAIR OR REPLACE STEAM TRAPS $17,413 $2,500 Implemented
DL0049 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,857 $2,180 Not Implemented
DL0049 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,500 $30,000 Implemented
DL0049 # 08 Y:2010 08 2010 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $190 $435 Not Implemented
DL0049 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,599 $50 Not Implemented
LE0294 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,248 $1,824 Implemented
LE0294 # 09 Y:2010 09 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $575 $40 Not Implemented
LE0294 # 08 Y:2010 08 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,483 $800 Not Implemented
LE0294 # 07 Y:2010 07 2010 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,376 $2,550 Not Implemented
LE0294 # 05 Y:2010 05 2010 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,844 $6,000 Not Implemented
LE0294 # 04 Y:2010 04 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,495 $3,000 Implemented
LE0294 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,696 $12,000 Not Implemented
LE0294 # 02 Y:2010 02 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,939 $3,600 Not Implemented
LE0294 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $62,047 $3,000 Not Implemented
OK0786 # 01 Y:2010 01 2010 OPERATE BOILERS ON HIGH FIRE SETTING $2,348 $24,000 Not Implemented
OK0786 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106 $604 Not Implemented
OK0786 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $453 $3,410 Not Implemented
OK0786 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $854 $0 Implemented