Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 2851 | Paints And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0353 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18 | $29 | Implemented |
SU0353 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $627 | $737 | Implemented |
SU0353 # 06 Y:2013 | 06 | 2013 | REPLACE BOILER | $34,391 | $40,935 | Implemented |
SU0353 # 05 Y:2013 | 05 | 2013 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,685 | $3,075 | Implemented |
SU0353 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $424 | $345 | Implemented |
SU0353 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $896 | $273 | Implemented |
SU0353 # 02 Y:2013 | 02 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,044 | $1,188 | Not Implemented |
SU0353 # 01 Y:2013 | 01 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $839 | $0 | Implemented |
UD0886 # 05 Y:2013 | 05 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,028 | $0 | Not Implemented |
UD0886 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,238 | $7,500 | Not Implemented |
UD0886 # 04 Y:2013 | 04 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $20,782 | $50,000 | Not Implemented |
UD0886 # 16 Y:2013 | 16 | 2013 | REDUCE VENTILATION AIR | $32,467 | $20,000 | Not Implemented |
UD0886 # 06 Y:2013 | 06 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,761 | $0 | Not Implemented |
UD0886 # 07 Y:2013 | 07 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $36,728 | $14,900 | Implemented |
UD0886 # 08 Y:2013 | 08 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $4,035 | $3,550 | Not Implemented |
UD0886 # 09 Y:2013 | 09 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $16,109 | $27,000 | Not Implemented |
UD0886 # 10 Y:2013 | 10 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $575 | $1,000 | Not Implemented |
UD0886 # 11 Y:2013 | 11 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $341 | $0 | Implemented |
UD0886 # 12 Y:2013 | 12 | 2013 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,648 | $6,720 | Implemented |
UD0886 # 13 Y:2013 | 13 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,167 | $0 | Not Implemented |
UD0886 # 14 Y:2013 | 14 | 2013 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $2,995 | $0 | Implemented |
UD0886 # 15 Y:2013 | 15 | 2013 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $9,716 | $30,000 | Not Implemented |
UD0886 # 02 Y:2013 | 02 | 2013 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,317 | $1,000 | Not Implemented |
UD0886 # 01 Y:2013 | 01 | 2013 | MINIMIZE WATER USAGE | $32,244 | $1,000 | Not Implemented |
BD0423 # 12 Y:2013 | 12 | 2013 | REGENERATE CLEANING SOLVENT ON-SITE AND REUSE | $44,983 | $302,000 | Not Implemented |