Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
67
matching recommendationsSIC | 286 | Industrial Organic Chemicals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0387 # 06 Y:2011 | 06 | 2011 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $374,556 | $995,000 | Not Implemented |
BD0387 # 05 Y:2011 | 05 | 2011 | MINIMIZE WATER USAGE | $2,025 | $1,600 | Not Implemented |
BD0387 # 01 Y:2011 | 01 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $25,233 | $21,500 | Implemented |
BD0387 # 04 Y:2011 | 04 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,318 | $200 | Not Implemented |
BD0387 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $1,861 | $600 | Implemented |
BD0387 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,457 | $3,064 | Implemented |
IC0125 # 10 Y:2007 | 10 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,975 | $14,767 | Not Implemented |
IC0125 # 07 Y:2007 | 07 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $25,485 | $4,800 | Implemented |
IC0125 # 04 Y:2007 | 04 | 2007 | USE MINIMUM STEAM OPERATING PRESSURE | $611 | $0 | Implemented |
IC0125 # 12 Y:2007 | 12 | 2007 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,563 | $0 | Implemented |
IC0125 # 11 Y:2007 | 11 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,961 | $16,278 | Implemented |
IC0125 # 03 Y:2007 | 03 | 2007 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $227,690 | $372,000 | Not Implemented |
IC0125 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $305,019 | $900,000 | Not Implemented |
IC0125 # 09 Y:2007 | 09 | 2007 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $52,577 | $43,780 | Implemented |
IC0125 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $202,850 | $475,200 | Not Implemented |
IC0125 # 08 Y:2007 | 08 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $12,731 | $18,755 | Not Implemented |
IC0125 # 05 Y:2007 | 05 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $36,000 | $0 | Not Implemented |
IC0125 # 06 Y:2007 | 06 | 2007 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $21,910 | $4,260 | Not Implemented |
IC0060 # 01 Y:2003 | 01 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $148,006 | $13,000 | Implemented |
IC0060 # 08 Y:2003 | 08 | 2003 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,439 | $6,850 | Not Implemented |
IC0060 # 04 Y:2003 | 04 | 2003 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $163,590 | $170,491 | Implemented |
IC0060 # 06 Y:2003 | 06 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,196 | $22,867 | Not Implemented |
IC0060 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,390 | $20,640 | Implemented |
IC0060 # 02 Y:2003 | 02 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,832 | $13,240 | Implemented |
IC0060 # 10 Y:2003 | 10 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,705 | $11,354 | Implemented |