Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
78
matching recommendationsSIC | 286 | Industrial Organic Chemicals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0313 # 07 Y:2024 | 07 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,223 | $100,000 | n/a |
IC0313 # 05 Y:2024 | 05 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $6,524 | $27,807 | n/a |
IC0313 # 09 Y:2024 | 09 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $19,590 | $704 | n/a |
IC0313 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,107 | $6,125 | n/a |
IC0313 # 08 Y:2024 | 08 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $75,451 | $92,231 | n/a |
IC0313 # 10 Y:2024 | 10 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,979 | $2,430 | n/a |
IC0313 # 01 Y:2024 | 01 | 2024 | OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS | $9,651 | $7,079 | n/a |
IC0313 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,211 | $220,985 | n/a |
IC0313 # 06 Y:2024 | 06 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,557 | $0 | n/a |
IC0313 # 11 Y:2024 | 11 | 2024 | INSULATE BARE EQUIPMENT | $4,631 | $8,869 | n/a |
IC0313 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,562 | $0 | n/a |
BD0387 # 06 Y:2011 | 06 | 2011 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $374,556 | $995,000 | Not Implemented |
BD0387 # 05 Y:2011 | 05 | 2011 | MINIMIZE WATER USAGE | $2,025 | $1,600 | Not Implemented |
BD0387 # 01 Y:2011 | 01 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $25,233 | $21,500 | Implemented |
BD0387 # 04 Y:2011 | 04 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,318 | $200 | Not Implemented |
BD0387 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $1,861 | $600 | Implemented |
BD0387 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,457 | $3,064 | Implemented |
IC0125 # 08 Y:2007 | 08 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $12,731 | $18,755 | Not Implemented |
IC0125 # 06 Y:2007 | 06 | 2007 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $21,910 | $4,260 | Not Implemented |
IC0125 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $305,019 | $900,000 | Not Implemented |
IC0125 # 09 Y:2007 | 09 | 2007 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $52,577 | $43,780 | Implemented |
IC0125 # 10 Y:2007 | 10 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,975 | $14,767 | Not Implemented |
IC0125 # 12 Y:2007 | 12 | 2007 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,563 | $0 | Implemented |
IC0125 # 03 Y:2007 | 03 | 2007 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $227,690 | $372,000 | Not Implemented |
IC0125 # 04 Y:2007 | 04 | 2007 | USE MINIMUM STEAM OPERATING PRESSURE | $611 | $0 | Implemented |