IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

765

matching recommendations
Reset
SIC 2869 Industrial Organic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0410 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,380 $280 Implemented
OK0749 # 01 Y:2007 01 2007 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $74,106 $206,725 Not Implemented
OK0749 # 02 Y:2007 02 2007 REDUCE EXCESSIVE BOILER BLOWDOWN $66,275 $21,000 Not Implemented
OK0749 # 03 Y:2007 03 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $126,819 $38,280 Not Implemented
OK0749 # 04 Y:2007 04 2007 REPAIR AND ELIMINATE STEAM LEAKS $93,609 $4,680 Not Implemented
OK0749 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,286 $1,985 Not Implemented
OK0749 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,461 $0 Implemented
OK0749 # 07 Y:2007 07 2007 INCREASE AMOUNT OF CONDENSATE RETURNED $181,080 $110,352 Not Implemented
OK0749 # 08 Y:2007 08 2007 OPERATE BOILERS ON HIGH FIRE SETTING $238,762 $50,000 Not Implemented
IC0125 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $202,850 $475,200 Not Implemented
IC0125 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $305,019 $900,000 Not Implemented
IC0125 # 03 Y:2007 03 2007 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $227,690 $372,000 Not Implemented
IC0125 # 04 Y:2007 04 2007 USE MINIMUM STEAM OPERATING PRESSURE $611 $0 Implemented
IC0125 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,000 $0 Not Implemented
IC0125 # 06 Y:2007 06 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,910 $4,260 Not Implemented
IC0125 # 07 Y:2007 07 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,485 $4,800 Implemented
IC0125 # 08 Y:2007 08 2007 UPGRADE CONTROLS ON COMPRESSORS $12,731 $18,755 Not Implemented
IC0125 # 09 Y:2007 09 2007 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $52,577 $43,780 Implemented
IC0125 # 10 Y:2007 10 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,975 $14,767 Not Implemented
IC0125 # 11 Y:2007 11 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,961 $16,278 Implemented
IC0125 # 12 Y:2007 12 2007 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,563 $0 Implemented
NC0350 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $122,745 $114,000 Not Implemented
NC0350 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,138 $10,500 Not Implemented
NC0350 # 03 Y:2006 03 2006 USE OPTIMUM THICKNESS INSULATION $12,275 $1,000 Implemented
NC0350 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,381 $2,000 Not Implemented