IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

765

matching recommendations
Reset
SIC 2869 Industrial Organic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0635 # 01 Y:1998 01 1998 INCREASE AMOUNT OF CONDENSATE RETURNED $429,120 $36,880 Not Implemented
TN0635 # 02 Y:1998 02 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $39,020 $13,600 Implemented
TN0635 # 03 Y:1998 03 1998 USE MINIMUM STEAM OPERATING PRESSURE $22,590 $46,880 Not Implemented
TN0635 # 04 Y:1998 04 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $9,760 $3,580 Implemented
TN0635 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,180 $0 Not Implemented
NC0143 # 01 Y:1998 01 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,467 $700 Implemented
NC0143 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $50,294 $280,937 Not Implemented
NC0143 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $21,615 $25,600 Not Implemented
NC0143 # 04 Y:1998 04 1998 REDUCE FLUID FLOW RATES $2,040 $2,500 Not Implemented
NC0143 # 05 Y:1998 05 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $15,191 $30,000 Not Implemented
NC0143 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $45,561 $55,000 Not Implemented
UL0191 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $12,699 $13,313 Not Implemented
UL0191 # 02 Y:1998 02 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,913 $0 Not Implemented
UL0191 # 03 Y:1998 03 1998 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $390,882 $340,000 Not Implemented
UL0191 # 04 Y:1998 04 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $8,735 $8,500 Not Implemented
UL0191 # 05 Y:1998 05 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $81,500 $15,000 Not Implemented
UD0516 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,109 $14,870 Not Implemented
UD0516 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,524 $8,150 Implemented
UD0516 # 03 Y:1997 03 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,785 $1,200 Not Implemented
UD0516 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,205 $978 Implemented
UD0516 # 05 Y:1997 05 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,669 $500 Not Implemented
UD0513 # 01 Y:1997 01 1997 RECOVER AND REUSE COOLING WATER $82,051 $370,000 Not Implemented
UD0513 # 02 Y:1997 02 1997 RECOVER AND REUSE COOLING WATER $82,538 $50,000 Not Implemented
UD0513 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN WATER LINES AND VALVES $195,658 $50,000 Not Implemented
UD0513 # 04 Y:1997 04 1997 OPTIMIZE PLANT POWER FACTOR $21,006 $25,000 Implemented