IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

765

matching recommendations
Reset
SIC 2869 Industrial Organic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0062 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,081 $4,092 Not Implemented
IP0062 # 06 Y:2016 06 2016 INSTALL SPECTRAL REFLECTORS / DELAMP $1,743 $2,278 Not Implemented
IP0062 # 07 Y:2016 07 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,609 $12,262 Not Implemented
MA0754 # 01 Y:2016 01 2016 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $1,595,248 $5,445,000 Not Implemented
MA0754 # 02 Y:2016 02 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $112,215 $1,000 Not Implemented
MA0754 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $71,309 $500,000 Not Implemented
MA0754 # 04 Y:2016 04 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $62,104 $250,000 Not Implemented
MA0754 # 05 Y:2016 05 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $34,769 $3,000 Implemented
MA0754 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,043 $13,895 Implemented
MA0754 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,913 $4,940 Implemented
MA0754 # 08 Y:2016 08 2016 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $1,151 $500 Not Implemented
DL0143 # 01 Y:2015 01 2015 REDUCE VENTILATION AIR $12,970 $0 Implemented
DL0143 # 02 Y:2015 02 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,928 $0 Implemented
DL0143 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,030 $1,000 Not Implemented
DL0143 # 04 Y:2015 04 2015 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,988 $0 Not Implemented
DL0143 # 05 Y:2015 05 2015 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,468 $200 Not Implemented
DL0143 # 06 Y:2015 06 2015 INSTALL TIMERS AND/OR THERMOSTATS $1,582 $3,000 Implemented
DL0143 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $855 $0 Implemented
AM0676 # 01 Y:2015 01 2015 REPAIR OR REPLACE STEAM TRAPS $54,800 $13,155 Implemented
AM0676 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $12,300 $100,000 Not Implemented
AM0676 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $10,520 $46,590 Not Implemented
AM0676 # 04 Y:2015 04 2015 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,438 $0 Not Implemented
AM0676 # 05 Y:2015 05 2015 REPAIR AND ELIMINATE STEAM LEAKS $7,850 $4,000 Implemented
AM0676 # 06 Y:2015 06 2015 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,100 $0 Not Implemented
AM0676 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,420 $7,200 Not Implemented