Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
765
matching recommendationsSIC | 2869 | Industrial Organic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0062 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,081 | $4,092 | Not Implemented |
IP0062 # 06 Y:2016 | 06 | 2016 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,743 | $2,278 | Not Implemented |
IP0062 # 07 Y:2016 | 07 | 2016 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,609 | $12,262 | Not Implemented |
MA0754 # 01 Y:2016 | 01 | 2016 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,595,248 | $5,445,000 | Not Implemented |
MA0754 # 02 Y:2016 | 02 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $112,215 | $1,000 | Not Implemented |
MA0754 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $71,309 | $500,000 | Not Implemented |
MA0754 # 04 Y:2016 | 04 | 2016 | INCREASE AMOUNT OF CONDENSATE RETURNED | $62,104 | $250,000 | Not Implemented |
MA0754 # 05 Y:2016 | 05 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $34,769 | $3,000 | Implemented |
MA0754 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,043 | $13,895 | Implemented |
MA0754 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,913 | $4,940 | Implemented |
MA0754 # 08 Y:2016 | 08 | 2016 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $1,151 | $500 | Not Implemented |
DL0143 # 01 Y:2015 | 01 | 2015 | REDUCE VENTILATION AIR | $12,970 | $0 | Implemented |
DL0143 # 02 Y:2015 | 02 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,928 | $0 | Implemented |
DL0143 # 03 Y:2015 | 03 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,030 | $1,000 | Not Implemented |
DL0143 # 04 Y:2015 | 04 | 2015 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $1,988 | $0 | Not Implemented |
DL0143 # 05 Y:2015 | 05 | 2015 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,468 | $200 | Not Implemented |
DL0143 # 06 Y:2015 | 06 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $1,582 | $3,000 | Implemented |
DL0143 # 07 Y:2015 | 07 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $855 | $0 | Implemented |
AM0676 # 01 Y:2015 | 01 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $54,800 | $13,155 | Implemented |
AM0676 # 02 Y:2015 | 02 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,300 | $100,000 | Not Implemented |
AM0676 # 03 Y:2015 | 03 | 2015 | OPTIMIZE PLANT POWER FACTOR | $10,520 | $46,590 | Not Implemented |
AM0676 # 04 Y:2015 | 04 | 2015 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $10,438 | $0 | Not Implemented |
AM0676 # 05 Y:2015 | 05 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $7,850 | $4,000 | Implemented |
AM0676 # 06 Y:2015 | 06 | 2015 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,100 | $0 | Not Implemented |
AM0676 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,420 | $7,200 | Not Implemented |