Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
67
matching recommendationsSIC | 2869 | Industrial Organic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0313 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,211 | $220,985 | n/a |
IC0313 # 09 Y:2024 | 09 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $19,590 | $704 | n/a |
IC0313 # 10 Y:2024 | 10 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,979 | $2,430 | n/a |
IC0313 # 05 Y:2024 | 05 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $6,524 | $27,807 | n/a |
IC0313 # 11 Y:2024 | 11 | 2024 | INSULATE BARE EQUIPMENT | $4,631 | $8,869 | n/a |
IC0313 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,562 | $0 | n/a |
IC0313 # 07 Y:2024 | 07 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,223 | $100,000 | n/a |
IC0313 # 08 Y:2024 | 08 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $75,451 | $92,231 | n/a |
IC0313 # 06 Y:2024 | 06 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,557 | $0 | n/a |
IC0313 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,107 | $6,125 | n/a |
IC0313 # 01 Y:2024 | 01 | 2024 | OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS | $9,651 | $7,079 | n/a |
BD0387 # 04 Y:2011 | 04 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,318 | $200 | Not Implemented |
BD0387 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,457 | $3,064 | Implemented |
BD0387 # 05 Y:2011 | 05 | 2011 | MINIMIZE WATER USAGE | $2,025 | $1,600 | Not Implemented |
BD0387 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $1,861 | $600 | Implemented |
BD0387 # 01 Y:2011 | 01 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $25,233 | $21,500 | Implemented |
BD0387 # 06 Y:2011 | 06 | 2011 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $374,556 | $995,000 | Not Implemented |
IC0125 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $305,019 | $900,000 | Not Implemented |
IC0125 # 04 Y:2007 | 04 | 2007 | USE MINIMUM STEAM OPERATING PRESSURE | $611 | $0 | Implemented |
IC0125 # 11 Y:2007 | 11 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,961 | $16,278 | Implemented |
IC0125 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $202,850 | $475,200 | Not Implemented |
IC0125 # 05 Y:2007 | 05 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $36,000 | $0 | Not Implemented |
IC0125 # 03 Y:2007 | 03 | 2007 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $227,690 | $372,000 | Not Implemented |
IC0125 # 07 Y:2007 | 07 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $25,485 | $4,800 | Implemented |
IC0125 # 08 Y:2007 | 08 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $12,731 | $18,755 | Not Implemented |