IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
SIC 2869 Industrial Organic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0313 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $24,211 $220,985 n/a
IC0313 # 09 Y:2024 09 2024 REPAIR AND ELIMINATE STEAM LEAKS $19,590 $704 n/a
IC0313 # 10 Y:2024 10 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,979 $2,430 n/a
IC0313 # 05 Y:2024 05 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $6,524 $27,807 n/a
IC0313 # 11 Y:2024 11 2024 INSULATE BARE EQUIPMENT $4,631 $8,869 n/a
IC0313 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,562 $0 n/a
IC0313 # 07 Y:2024 07 2024 RECOVER WASTE HEAT FROM EQUIPMENT $10,223 $100,000 n/a
IC0313 # 08 Y:2024 08 2024 ADOPT IN-HOUSE MATERIAL GENERATION $75,451 $92,231 n/a
IC0313 # 06 Y:2024 06 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,557 $0 n/a
IC0313 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,107 $6,125 n/a
IC0313 # 01 Y:2024 01 2024 OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS $9,651 $7,079 n/a
BD0387 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,318 $200 Not Implemented
BD0387 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,457 $3,064 Implemented
BD0387 # 05 Y:2011 05 2011 MINIMIZE WATER USAGE $2,025 $1,600 Not Implemented
BD0387 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,861 $600 Implemented
BD0387 # 01 Y:2011 01 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,233 $21,500 Implemented
BD0387 # 06 Y:2011 06 2011 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $374,556 $995,000 Not Implemented
IC0125 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $305,019 $900,000 Not Implemented
IC0125 # 04 Y:2007 04 2007 USE MINIMUM STEAM OPERATING PRESSURE $611 $0 Implemented
IC0125 # 11 Y:2007 11 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,961 $16,278 Implemented
IC0125 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $202,850 $475,200 Not Implemented
IC0125 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,000 $0 Not Implemented
IC0125 # 03 Y:2007 03 2007 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $227,690 $372,000 Not Implemented
IC0125 # 07 Y:2007 07 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,485 $4,800 Implemented
IC0125 # 08 Y:2007 08 2007 UPGRADE CONTROLS ON COMPRESSORS $12,731 $18,755 Not Implemented