Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsSIC | 2869 | Industrial Organic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0387 # 04 Y:2011 | 04 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,318 | $200 | Not Implemented |
BD0387 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,457 | $3,064 | Implemented |
BD0387 # 01 Y:2011 | 01 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $25,233 | $21,500 | Implemented |
BD0387 # 05 Y:2011 | 05 | 2011 | MINIMIZE WATER USAGE | $2,025 | $1,600 | Not Implemented |
BD0387 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $1,861 | $600 | Implemented |
BD0387 # 06 Y:2011 | 06 | 2011 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $374,556 | $995,000 | Not Implemented |
IC0125 # 10 Y:2007 | 10 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,975 | $14,767 | Not Implemented |
IC0125 # 09 Y:2007 | 09 | 2007 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $52,577 | $43,780 | Implemented |
IC0125 # 08 Y:2007 | 08 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $12,731 | $18,755 | Not Implemented |
IC0125 # 07 Y:2007 | 07 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $25,485 | $4,800 | Implemented |
IC0125 # 06 Y:2007 | 06 | 2007 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $21,910 | $4,260 | Not Implemented |
IC0125 # 05 Y:2007 | 05 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $36,000 | $0 | Not Implemented |
IC0125 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $202,850 | $475,200 | Not Implemented |
IC0125 # 11 Y:2007 | 11 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,961 | $16,278 | Implemented |
IC0125 # 12 Y:2007 | 12 | 2007 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,563 | $0 | Implemented |
IC0125 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $305,019 | $900,000 | Not Implemented |
IC0125 # 03 Y:2007 | 03 | 2007 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $227,690 | $372,000 | Not Implemented |
IC0125 # 04 Y:2007 | 04 | 2007 | USE MINIMUM STEAM OPERATING PRESSURE | $611 | $0 | Implemented |
IC0060 # 07 Y:2003 | 07 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $11,372 | $5,850 | Implemented |
IC0060 # 09 Y:2003 | 09 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,626 | $13,998 | Implemented |
IC0060 # 06 Y:2003 | 06 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,196 | $22,867 | Not Implemented |
IC0060 # 05 Y:2003 | 05 | 2003 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $92,294 | $190,000 | Not Implemented |
IC0060 # 04 Y:2003 | 04 | 2003 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $163,590 | $170,491 | Implemented |
IC0060 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,390 | $20,640 | Implemented |
IC0060 # 02 Y:2003 | 02 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,832 | $13,240 | Implemented |