IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

770

matching recommendations
Reset
SIC 289 Miscellaneous Chemical Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0678 # 16 Y:2025 16 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,980 $304 Implemented
WV0678 # 14 Y:2025 14 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,031 $684 Implemented
WV0678 # 04 Y:2025 04 2025 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,735 $5,200 Implemented
WV0678 # 15 Y:2025 15 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,433 $11,061 Implemented
WV0678 # 06 Y:2025 06 2025 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,185 $11,425 Implemented
WV0678 # 08 Y:2025 08 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,842 $11,112 Implemented
WV0678 # 07 Y:2025 07 2025 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,003 $3,121 Implemented
WV0678 # 13 Y:2025 13 2025 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,130 $2,676 Implemented
WV0678 # 18 Y:2025 18 2025 INSULATE BARE EQUIPMENT $664 $914 Implemented
WV0678 # 09 Y:2025 09 2025 INSTALL OCCUPANCY SENSORS $4,772 $4,323 Implemented
WV0678 # 12 Y:2025 12 2025 DEVELOP A REPAIR/REPLACE POLICY $4,059 $1,304 Implemented
WV0678 # 19 Y:2025 19 2025 REDUCE VENTILATION AIR $631 $2,400 Implemented
WV0678 # 17 Y:2025 17 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,209 $3,002 Implemented
WV0674 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $225 $88 Implemented
WV0674 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $393 $122 Implemented
WV0674 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,374 $8,262 Implemented
WV0674 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,766 $8,674 Implemented
WV0674 # 04 Y:2024 04 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $696 $1,133 Implemented
WV0674 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $148 $482 Implemented
SD0661 # 11 Y:2024 11 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $1,863 Implemented
SD0661 # 13 Y:2024 13 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,043 $19,842 Implemented
SD0661 # 02 Y:2024 02 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $1,321,862 $54,390 Implemented
SD0661 # 05 Y:2024 05 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,205 $0 Implemented
SD0661 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $854 $250 Implemented
SD0661 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,348 $676 Implemented