IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

742

matching recommendations
Reset
SIC 289 Miscellaneous Chemical Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0451 # 06 Y:2011 06 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $498 $0 Implemented
TT0080 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,663 $100 Implemented
UF0445 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,864 $4,542 Implemented
UF0445 # 04 Y:2011 04 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $25,323 $75,000 Implemented
UF0445 # 06 Y:2011 06 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,582 $2,580 Implemented
UF0445 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,370 $8,778 Implemented
SD0437 # 02 Y:2011 02 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $58,730 $2,850 Implemented
SD0437 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,326 $700 Implemented
SD0437 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,396 $2,000 Implemented
AM0591 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $10,060 $15,900 Implemented
AM0591 # 04 Y:2011 04 2011 REPAIR AND ELIMINATE STEAM LEAKS $9,540 $5,000 Implemented
AM0591 # 05 Y:2011 05 2011 REPAIR OR REPLACE STEAM TRAPS $5,270 $1,300 Implemented
AM0591 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,275 $4,290 Implemented
AM0591 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $2,200 $950 Implemented
AM0591 # 09 Y:2011 09 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,800 $325 Implemented
AM0591 # 12 Y:2011 12 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $310 $170 Implemented
WV0416 # 02 Y:2010 02 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,496 $2,500 Implemented
WV0416 # 07 Y:2010 07 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,558 $1,000 Implemented
WV0416 # 08 Y:2010 08 2010 DEVELOP A REPAIR/REPLACE POLICY $3,797 $830 Implemented
WV0416 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,776 $1,360 Implemented
LL0332 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,186 $1,815 Implemented
LL0332 # 02 Y:2010 02 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,014 $450 Implemented
LL0332 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $658 $350 Implemented
LL0332 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $477 $30 Implemented
LL0332 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $372 $156 Implemented