IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

70

matching recommendations
Reset
SIC 289 Miscellaneous Chemical Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0661 # 02 Y:2024 02 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $1,321,862 $54,390 Implemented
SD0661 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $641,754 $589,764 Implemented
SD0661 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,348 $676 Implemented
SD0661 # 06 Y:2024 06 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,354 $0 Implemented
SD0661 # 05 Y:2024 05 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,205 $0 Implemented
SD0661 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $854 $250 Implemented
SD0661 # 11 Y:2024 11 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $1,863 Implemented
SD0661 # 13 Y:2024 13 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,043 $19,842 Implemented
SD0661 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,243 $7,340 Implemented
SJ0008 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $265 $344 Implemented
SJ0008 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $365 $0 Implemented
SF0475 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,039 $0 Implemented
SF0475 # 08 Y:2015 08 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $57,696 $401,249 Implemented
SF0475 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,265 $9,844 Implemented
SF0475 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $1,345 $5,518 Implemented
SF0475 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $496 $1,340 Implemented
SF0475 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $703 $2,001 Implemented
SF0475 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $2,990 $822 Implemented
SF0475 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,033 $0 Implemented
SF0457 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $487 $898 Implemented
SF0457 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,420 $21,352 Implemented
SF0457 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $4,973 $3,386 Implemented
SD0477 # 05 Y:2013 05 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,263 $200 Implemented
SD0468 # 03 Y:2013 03 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,278 $1,600 Implemented
SD0468 # 01 Y:2013 01 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,265 $23,840 Implemented