IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 289 Miscellaneous Chemical Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0148 # 12 Y:2002 12 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $4,095 Implemented
LE0148 # 05 Y:2002 05 2002 INSULATE FEEDWATER TANK $121 $260 Implemented
LE0148 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,031 $300 Implemented
LE0148 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $993 $0 Implemented
LE0148 # 09 Y:2002 09 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,033 $750 Implemented
LE0148 # 10 Y:2002 10 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,308 $990 Implemented
TA0039 # 01 Y:2002 01 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $49,940 $0 Implemented
TA0039 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,330 $0 Implemented
TA0039 # 03 Y:2002 03 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,515 $0 Implemented
TA0039 # 04 Y:2002 04 2002 USE SYNTHETIC LUBRICANT $5,770 $0 Implemented
TA0039 # 05 Y:2002 05 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,290 $0 Implemented
TA0039 # 07 Y:2002 07 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $3,840 $0 Implemented
TA0039 # 08 Y:2002 08 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,805 $0 Implemented
TA0039 # 09 Y:2002 09 2002 INSTALL OCCUPANCY SENSORS $2,640 $0 Implemented
TA0035 # 05 Y:2002 05 2002 USE SYNTHETIC LUBRICANT $4,592 $0 Implemented
TA0035 # 08 Y:2002 08 2002 RECOVER AND REUSE WASTE MATERIAL $762 $0 Implemented
TA0035 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,139 $0 Implemented
TA0035 # 03 Y:2002 03 2002 RECOVER AND REUSE COOLING WATER $14,779 $6,925 Implemented
TA0035 # 02 Y:2002 02 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $26,355 $0 Implemented
TA0035 # 01 Y:2002 01 2002 REPAIR AND ELIMINATE STEAM LEAKS $306,746 $5,202 Implemented
SF0235 # 14 Y:2002 14 2002 OPTIMIZE PLANT POWER FACTOR $4,195 $7,970 Implemented
SF0235 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,612 $3,553 Implemented
SF0235 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,373 $300 Implemented
SF0235 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,228 $2,805 Implemented
LL0135 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,016 $13,170 Implemented