IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

598

matching recommendations
Reset
SIC 2891 Adhesives And Sealants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS015 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,906 $9,000 Not Implemented
MAS015 # 03 Y:2012 03 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $1,535 $3,900 Not Implemented
SD0437 # 01 Y:2011 01 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,036 $0 Not Implemented
SD0437 # 02 Y:2011 02 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $58,730 $2,850 Implemented
SD0437 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $3,552 $214 Not Implemented
SD0437 # 04 Y:2011 04 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,194 $610 Not Implemented
SD0437 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,326 $700 Implemented
SD0437 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,396 $2,000 Implemented
AM0591 # 01 Y:2011 01 2011 MINIMIZE WATER USAGE $141,000 $80,000 Not Implemented
AM0591 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $42,800 $13,800 Not Implemented
AM0591 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $10,060 $15,900 Implemented
AM0591 # 04 Y:2011 04 2011 REPAIR AND ELIMINATE STEAM LEAKS $9,540 $5,000 Implemented
AM0591 # 05 Y:2011 05 2011 REPAIR OR REPLACE STEAM TRAPS $5,270 $1,300 Implemented
AM0591 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,275 $4,290 Implemented
AM0591 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $2,200 $950 Implemented
AM0591 # 08 Y:2011 08 2011 INSULATE BARE EQUIPMENT $2,130 $950 Not Implemented
AM0591 # 09 Y:2011 09 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,800 $325 Implemented
AM0591 # 10 Y:2011 10 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $0 Not Implemented
AM0591 # 11 Y:2011 11 2011 INSTALL SKYLIGHTS $470 $0 Not Implemented
AM0591 # 12 Y:2011 12 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $310 $170 Implemented
WV0416 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,244 $30,500 Not Implemented
WV0416 # 02 Y:2010 02 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,496 $2,500 Implemented
WV0416 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $8,288 $2,374 Not Implemented
WV0416 # 04 Y:2010 04 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,114 $22,200 Not Implemented
WV0416 # 05 Y:2010 05 2010 USE SYNTHETIC LUBRICANT $7,111 $2,160 Not Implemented