Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
598
matching recommendationsSIC | 2891 | Adhesives And Sealants |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1613 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,264 | $1,200 | Implemented |
UK1613 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $871 | $0 | Implemented |
UK1613 # 08 Y:2017 | 08 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $535 | $0 | Implemented |
UK1613 # 09 Y:2017 | 09 | 2017 | USE ONLY CERTIFIED MOTOR REPAIR SHOPS | $478 | $756 | Implemented |
UK1613 # 10 Y:2017 | 10 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $145 | $0 | Implemented |
IP0078 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $1,354 | $3,396 | Implemented |
IP0078 # 03 Y:2017 | 03 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $320 | $752 | Not Implemented |
IP0078 # 02 Y:2017 | 02 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,032 | $21 | Implemented |
IP0078 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $820 | $4 | Implemented |
MA0762 # 10 Y:2016 | 10 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,185 | $7,200 | Not Implemented |
MA0762 # 09 Y:2016 | 09 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,192 | $4,000 | Not Implemented |
MA0762 # 08 Y:2016 | 08 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,943 | $100 | Not Implemented |
MA0762 # 07 Y:2016 | 07 | 2016 | INSULATE BARE EQUIPMENT | $6,359 | $2,631 | Not Implemented |
MA0762 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,640 | $13,585 | Implemented |
MA0762 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,587 | $19,980 | Implemented |
MA0762 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $49,046 | $65,000 | Implemented |
MA0762 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,257 | $19,975 | Implemented |
MA0762 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $65,741 | $161,899 | Implemented |
MA0762 # 01 Y:2016 | 01 | 2016 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $94,561 | $209,164 | Not Implemented |
WM0084 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,124 | $83,912 | Implemented |
WM0084 # 02 Y:2016 | 02 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,305 | $34,684 | Not Implemented |
WM0084 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,763 | $15,500 | Not Implemented |
WM0084 # 04 Y:2016 | 04 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,145 | $0 | Not Implemented |
WM0084 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,605 | $1,900 | Implemented |
WM0084 # 06 Y:2016 | 06 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,665 | $0 | Implemented |