IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

80

matching recommendations
Reset
SIC 2891 Adhesives And Sealants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0540 # 10 Y:2017 10 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $931 $200 Not Implemented
SD0540 # 01 Y:2017 01 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $42,256 $168,000 Not Implemented
SD0540 # 02 Y:2017 02 2017 USE POWER DURING OFF-PEAK PERIODS $33,558 $136,000 Not Implemented
SD0540 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,953 $11,528 Not Implemented
SD0540 # 04 Y:2017 04 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $17,767 $20,883 Not Implemented
SD0540 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,414 $16,180 Not Implemented
SD0540 # 06 Y:2017 06 2017 USE PHOTOCELL CONTROLS $2,234 $7,400 Not Implemented
SD0540 # 09 Y:2017 09 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $950 $2,520 Not Implemented
SD0540 # 07 Y:2017 07 2017 OPTIMIZE PLANT POWER FACTOR $1,665 $5,360 Not Implemented
SD0540 # 08 Y:2017 08 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,457 $1,100 Not Implemented
SF0475 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,039 $0 Implemented
SF0475 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $496 $1,340 Implemented
SF0475 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $2,990 $822 Implemented
SF0475 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,033 $0 Implemented
SF0475 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,265 $9,844 Implemented
SF0475 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $703 $2,001 Implemented
SF0475 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $1,345 $5,518 Implemented
SF0475 # 08 Y:2015 08 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $57,696 $401,249 Implemented
SD0437 # 02 Y:2011 02 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $58,730 $2,850 Implemented
SD0437 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,396 $2,000 Implemented
SD0437 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,326 $700 Implemented
SD0437 # 04 Y:2011 04 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,194 $610 Not Implemented
SD0437 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $3,552 $214 Not Implemented
SD0437 # 01 Y:2011 01 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,036 $0 Not Implemented
LM0093 # 05 Y:2005 05 2005 MODIFY WORKLOAD $32,448 $300 Not Implemented